Build a paver patio sized to whole pavers, with dig depth, gravel, sand, edging and slope worked out in cubic yards and bags. Set your size below and the 3D model, shopping list, cut list and every step update to match.
The patio is laid out in whole pavers: 10′ wide × 10′ out from the house. 12″ × 12″ patio stones are about 11¾″ square, 1½″ thick; the layout uses the nominal size, which includes the joint. Lay ten in a row at the store or at home and measure: if ten don't come to 10′, tell the layout, not the pavers.
Gravel and sand are priced by the cubic yard, delivered. Yards sell in half-yard steps and some have a one-yard minimum; anything left over fills low spots in the lawn.
| Item | Qty | Each | Total |
|---|---|---|---|
| 12″ × 12″ patio stone (100 laid + 5%) | 105 | $2.48 | $260.40 |
| Paver base (¾″-minus crushed stone), bulk, per cu yd (46.2 cu ft loose) | 2 | $52.00 | $104.00 |
| Concrete sand (coarse, washed), bulk, per cu yd (9.2 cu ft) | 0.5 | $55.00 | $27.50 |
| Delivery, both on one truck | 1 | $95.00 | $95.00 |
| Woven geotextile underlayment fabric, 4 ft × 50 ft roll (under the base; not thin weed barrier) | 1 | $32.00 | $32.00 |
| Paver edge restraint, rigid plastic, 6 ft section (30′ of edge) | 5 | $12.98 | $64.90 |
| 10″ × ⅜″ steel landscape spike (one per foot of edging) | 33 | $0.68 | $22.44 |
| Polymeric joint sand, 50-lb bag (coverage varies; check the bag) | 1 | $32.00 | $32.00 |
| ¾″ EMT conduit, 10 ft (screed rails, just under 1″ across) | 2 | $9.50 | $19.00 |
| Plate compactor, 1-day rental | 1 | $95.00 | $95.00 |
| Total | $752.24 |
| Quantity | The math | Result |
|---|---|---|
| Pavers | 10 across × 10 rows = 100, + 5% for breakage | 105 |
| Dig | 11′ × 10′ 6″ (6″ past the pavers on each open side) × 6½″ deep | 2.3 cu yd of soil |
| Gravel base | 11′ × 10′ 6″ × 4″ = 38.5 cu ft compacted, × 1.2 loose | 46.2 cu ft = 1.71 cu yd = 93 bags |
| Bedding sand | 10′ × 10′ × 1″, + 10% | 9.2 cu ft = 0.34 cu yd = 19 bags |
| Edging | 10′ + 2 × 10′ (none along the house) | 30′ = 5 sections |
| Fall | 10 ft × ¼″ per ft | 2½″ |
One cubic yard is 27 cu ft, or 54 half-cubic-foot bags. The soil you dig out swells by about a quarter in the pile: plan where 2.9 cu yd is going before you start.
Tools: flat spade and round-point shovel, wheelbarrow, steel rake, stakes, mason's string and a line level, 4-ft level, tape, straight 2×4 (screed), rubber mallet, push broom, garden hose with a shower nozzle, hand tamper for the corners, 3-lb hammer for the spikes, hacksaw or snips for the edging, gloves and knee pads.
No dimensional-lumber cuts to lay out for this build.
The layers follow the Interlocking Concrete Pavement Institute's patio detail: at least 4″ of compacted aggregate base, a nominal 1″ of bedding sand, edge restraints spiked into the base, and a fall of about ¼″ per foot away from the house. Use a deeper base on clay and wherever the ground freezes hard; your local paver yard knows what works in your soil. Paver sizes are nominal, as sold; measure yours and lay a test row before you dig. Quantities include the allowances shown in the shopping list. Prices are typical 2026 big-box and landscape-yard prices.
Loading community builds…
The patio is laid out in whole pavers: 10′ wide × 10′ out from the house. 12″ × 12″ patio stones are about 11¾″ square, 1½″ thick; the layout uses the nominal size, which includes the joint. Lay ten in a row at the store or at home and measure: if ten don't come to 10′, tell the layout, not the pavers.
Gravel and sand are priced by the cubic yard, delivered. Yards sell in half-yard steps and some have a one-yard minimum; anything left over fills low spots in the lawn.
| Item | Qty | Each | Total |
|---|---|---|---|
| 12″ × 12″ patio stone (100 laid + 5%) | 105 | $2.48 | $260.40 |
| Paver base (¾″-minus crushed stone), bulk, per cu yd (46.2 cu ft loose) | 2 | $52.00 | $104.00 |
| Concrete sand (coarse, washed), bulk, per cu yd (9.2 cu ft) | 0.5 | $55.00 | $27.50 |
| Delivery, both on one truck | 1 | $95.00 | $95.00 |
| Woven geotextile underlayment fabric, 4 ft × 50 ft roll (under the base; not thin weed barrier) | 1 | $32.00 | $32.00 |
| Paver edge restraint, rigid plastic, 6 ft section (30′ of edge) | 5 | $12.98 | $64.90 |
| 10″ × ⅜″ steel landscape spike (one per foot of edging) | 33 | $0.68 | $22.44 |
| Polymeric joint sand, 50-lb bag (coverage varies; check the bag) | 1 | $32.00 | $32.00 |
| ¾″ EMT conduit, 10 ft (screed rails, just under 1″ across) | 2 | $9.50 | $19.00 |
| Plate compactor, 1-day rental | 1 | $95.00 | $95.00 |
| Total | $752.24 |
| Quantity | The math | Result |
|---|---|---|
| Pavers | 10 across × 10 rows = 100, + 5% for breakage | 105 |
| Dig | 11′ × 10′ 6″ (6″ past the pavers on each open side) × 6½″ deep | 2.3 cu yd of soil |
| Gravel base | 11′ × 10′ 6″ × 4″ = 38.5 cu ft compacted, × 1.2 loose | 46.2 cu ft = 1.71 cu yd = 93 bags |
| Bedding sand | 10′ × 10′ × 1″, + 10% | 9.2 cu ft = 0.34 cu yd = 19 bags |
| Edging | 10′ + 2 × 10′ (none along the house) | 30′ = 5 sections |
| Fall | 10 ft × ¼″ per ft | 2½″ |
One cubic yard is 27 cu ft, or 54 half-cubic-foot bags. The soil you dig out swells by about a quarter in the pile: plan where 2.9 cu yd is going before you start.
Tools: flat spade and round-point shovel, wheelbarrow, steel rake, stakes, mason's string and a line level, 4-ft level, tape, straight 2×4 (screed), rubber mallet, push broom, garden hose with a shower nozzle, hand tamper for the corners, 3-lb hammer for the spikes, hacksaw or snips for the edging, gloves and knee pads.
Nothing to cut. The patio is sized to whole pavers (10 × 10), so there is no saw work and this list is empty.
Call 811 a few days before you dig so buried lines are marked.
Stake out the dig: 11′ × 10′ 6″, which is the patio plus 6″ on every open side for the base to run past the edging. Square it by measuring the diagonals (both 15′ 2½″).
Set the slope with string, now. Run strings from stakes at the house out to stakes at the far edge. Level each string with the line level, then slide the far end down 2½″ (¼″ for each of the 10 ft). The strings are now the finished surface; everything below is measured down from them.
Dig 6½″ below the strings everywhere: 4″ of base + 1″ of sand + the 1½″ paver. The bottom of the hole slopes with the strings. Scrape the last inch rather than dig it, then run the plate compactor over the bare soil.
Roll the geotextile fabric over the soil, lapping the strips 12″ and running it up the sides. It keeps the base from being pushed down into the soil.
The model draws the lawn on the far sides only, so you can see the layers build up.
Spread the paver base in 2 lifts of about 2″ (never more than 3″ at once), rake each lift to follow the strings, dampen it and make at least two passes with the plate compactor in each direction. Use the hand tamper where the machine can't reach, along the house.
The finished base must be 2½″ below the strings everywhere, flat to within ⅜″ under a 10-ft straightedge, and hard enough that your heel leaves no mark. Fix dips with more base and the compactor, never with extra sand.
Lay the two lengths of conduit on the base about 6 ft apart, running out from the house. Pour sand between and over them, then pull the straight 2×4 along the pipes with a sawing motion. That leaves a bed exactly one pipe thick, about 1″.
Lift the pipes out, fill the grooves with sand and smooth them with a trowel. Work in sections you can reach, and don't walk on or compact the screeded sand.
Use coarse concrete sand (or bagged paver leveling sand), not play sand or stone dust. The sand covers the 10′ × 10′ paver field only.
Start at the house, in a corner and work outward, kneeling on pavers you have already laid. Set each paver straight down against its neighbours; don't slide it through the sand. 10 pavers across, 10 rows out.
Grid: all joints line up in both directions. Leave a joint of about ⅛″ (most pavers have spacer nibs that set it).
Stretch a string along every third or fourth row to keep the lines straight, and check the patio's width now and then: it should stay 10′. Tap pavers into line with the mallet.
Mix pavers from several pallets or bundles as you go so the colour variation is spread evenly.
With a trowel, cut the sand away along the outside of the last pavers, down to the compacted base. Set the edge restraint on the base, tight against the pavers, on the three open sides: 30′ in all, 5 six-foot sections.
Drive a 10″ spike through the flange every 12″ (33 spikes), and one within a few inches of each end and corner. The spike goes into the base, which is why the base runs 6″ past the pavers.
Edging set on top of the sand will creep; without edging the outer rows spread, the joints open and the sand washes out.
Sweep the surface clean and make two passes with the plate compactor. This beds the pavers about ¼″ into the sand and brings them level with each other.
Sweep polymeric sand into the joints on a bone-dry surface (1 bag), compact once more, top up, then blow or sweep every grain off the paver faces. Mist with the shower nozzle exactly as the bag says: too little water and it won't set, too much washes the binder out and leaves a haze.
Backfill soil over the edging flange up to the top of the pavers and lay the sod back.
Keep rain and feet off the patio for 24 hours while the joints set.
A 10′ × 10′ patio, 100 sq ft, on 4″ of compacted base, falling 2½″ away from the house so water runs off.
No dimensional-lumber cuts to lay out for this build.
The layers follow the Interlocking Concrete Pavement Institute's patio detail: at least 4″ of compacted aggregate base, a nominal 1″ of bedding sand, edge restraints spiked into the base, and a fall of about ¼″ per foot away from the house. Use a deeper base on clay and wherever the ground freezes hard; your local paver yard knows what works in your soil. Paver sizes are nominal, as sold; measure yours and lay a test row before you dig. Quantities include the allowances shown in the shopping list. Prices are typical 2026 big-box and landscape-yard prices.
Before you build. This plan is a free guide. It is not an engineered, code-reviewed or load-tested design. Check every measurement against your own space and materials, follow your tools' manuals, and stop and ask a licensed professional if you are unsure. You build and use it at your own risk. Full disclaimer: /disclaimer on the site.
The whole build on one page
All 9 steps for the default size (10′ × 10′; 100 pavers · 4″ base · dig 6½″). The interactive manual at the top of this page rewrites every number here for the size you choose.
Step 1 of 9
The patio is laid out in whole pavers: 10′ wide × 10′ out from the house. 12″ × 12″ patio stones are about 11¾″ square, 1½″ thick; the layout uses the nominal size, which includes the joint. Lay ten in a row at the store or at home and measure: if ten don't come to 10′, tell the layout, not the pavers.
Gravel and sand are priced by the cubic yard, delivered. Yards sell in half-yard steps and some have a one-yard minimum; anything left over fills low spots in the lawn.
| Item | Qty | Each | Total |
|---|---|---|---|
| 12″ × 12″ patio stone (100 laid + 5%) | 105 | $2.48 | $260.40 |
| Paver base (¾″-minus crushed stone), bulk, per cu yd (46.2 cu ft loose) | 2 | $52.00 | $104.00 |
| Concrete sand (coarse, washed), bulk, per cu yd (9.2 cu ft) | 0.5 | $55.00 | $27.50 |
| Delivery, both on one truck | 1 | $95.00 | $95.00 |
| Woven geotextile underlayment fabric, 4 ft × 50 ft roll (under the base; not thin weed barrier) | 1 | $32.00 | $32.00 |
| Paver edge restraint, rigid plastic, 6 ft section (30′ of edge) | 5 | $12.98 | $64.90 |
| 10″ × ⅜″ steel landscape spike (one per foot of edging) | 33 | $0.68 | $22.44 |
| Polymeric joint sand, 50-lb bag (coverage varies; check the bag) | 1 | $32.00 | $32.00 |
| ¾″ EMT conduit, 10 ft (screed rails, just under 1″ across) | 2 | $9.50 | $19.00 |
| Plate compactor, 1-day rental | 1 | $95.00 | $95.00 |
| Total | $752.24 |
| Quantity | The math | Result |
|---|---|---|
| Pavers | 10 across × 10 rows = 100, + 5% for breakage | 105 |
| Dig | 11′ × 10′ 6″ (6″ past the pavers on each open side) × 6½″ deep | 2.3 cu yd of soil |
| Gravel base | 11′ × 10′ 6″ × 4″ = 38.5 cu ft compacted, × 1.2 loose | 46.2 cu ft = 1.71 cu yd = 93 bags |
| Bedding sand | 10′ × 10′ × 1″, + 10% | 9.2 cu ft = 0.34 cu yd = 19 bags |
| Edging | 10′ + 2 × 10′ (none along the house) | 30′ = 5 sections |
| Fall | 10 ft × ¼″ per ft | 2½″ |
One cubic yard is 27 cu ft, or 54 half-cubic-foot bags. The soil you dig out swells by about a quarter in the pile: plan where 2.9 cu yd is going before you start.
Tools: flat spade and round-point shovel, wheelbarrow, steel rake, stakes, mason's string and a line level, 4-ft level, tape, straight 2×4 (screed), rubber mallet, push broom, garden hose with a shower nozzle, hand tamper for the corners, 3-lb hammer for the spikes, hacksaw or snips for the edging, gloves and knee pads.
Step 2 of 9
Nothing to cut. The patio is sized to whole pavers (10 × 10), so there is no saw work and this list is empty.
Step 3 of 9
Call 811 a few days before you dig so buried lines are marked.
Stake out the dig: 11′ × 10′ 6″, which is the patio plus 6″ on every open side for the base to run past the edging. Square it by measuring the diagonals (both 15′ 2½″).
Set the slope with string, now. Run strings from stakes at the house out to stakes at the far edge. Level each string with the line level, then slide the far end down 2½″ (¼″ for each of the 10 ft). The strings are now the finished surface; everything below is measured down from them.
Dig 6½″ below the strings everywhere: 4″ of base + 1″ of sand + the 1½″ paver. The bottom of the hole slopes with the strings. Scrape the last inch rather than dig it, then run the plate compactor over the bare soil.
Roll the geotextile fabric over the soil, lapping the strips 12″ and running it up the sides. It keeps the base from being pushed down into the soil.
The model draws the lawn on the far sides only, so you can see the layers build up.
Step 4 of 9
Spread the paver base in 2 lifts of about 2″ (never more than 3″ at once), rake each lift to follow the strings, dampen it and make at least two passes with the plate compactor in each direction. Use the hand tamper where the machine can't reach, along the house.
The finished base must be 2½″ below the strings everywhere, flat to within ⅜″ under a 10-ft straightedge, and hard enough that your heel leaves no mark. Fix dips with more base and the compactor, never with extra sand.
Step 5 of 9
Lay the two lengths of conduit on the base about 6 ft apart, running out from the house. Pour sand between and over them, then pull the straight 2×4 along the pipes with a sawing motion. That leaves a bed exactly one pipe thick, about 1″.
Lift the pipes out, fill the grooves with sand and smooth them with a trowel. Work in sections you can reach, and don't walk on or compact the screeded sand.
Use coarse concrete sand (or bagged paver leveling sand), not play sand or stone dust. The sand covers the 10′ × 10′ paver field only.
Step 6 of 9
Start at the house, in a corner and work outward, kneeling on pavers you have already laid. Set each paver straight down against its neighbours; don't slide it through the sand. 10 pavers across, 10 rows out.
Grid: all joints line up in both directions. Leave a joint of about ⅛″ (most pavers have spacer nibs that set it).
Stretch a string along every third or fourth row to keep the lines straight, and check the patio's width now and then: it should stay 10′. Tap pavers into line with the mallet.
Mix pavers from several pallets or bundles as you go so the colour variation is spread evenly.
Step 7 of 9
With a trowel, cut the sand away along the outside of the last pavers, down to the compacted base. Set the edge restraint on the base, tight against the pavers, on the three open sides: 30′ in all, 5 six-foot sections.
Drive a 10″ spike through the flange every 12″ (33 spikes), and one within a few inches of each end and corner. The spike goes into the base, which is why the base runs 6″ past the pavers.
Edging set on top of the sand will creep; without edging the outer rows spread, the joints open and the sand washes out.
Step 8 of 9
Sweep the surface clean and make two passes with the plate compactor. This beds the pavers about ¼″ into the sand and brings them level with each other.
Sweep polymeric sand into the joints on a bone-dry surface (1 bag), compact once more, top up, then blow or sweep every grain off the paver faces. Mist with the shower nozzle exactly as the bag says: too little water and it won't set, too much washes the binder out and leaves a haze.
Backfill soil over the edging flange up to the top of the pavers and lay the sod back.
Keep rain and feet off the patio for 24 hours while the joints set.
Step 9 of 9
A 10′ × 10′ patio, 100 sq ft, on 4″ of compacted base, falling 2½″ away from the house so water runs off.
Questions
Answers come straight from this plan's own numbers at its default size.
At the default size (10′ × 10′), the shopping list comes to $752.24. That uses the site's default prices (lumber at Home Depot prices in Dallas–Fort Worth, November 2026) and typical prices for hardware and other materials. Enter what your store charges and the total updates for your size and your prices.
Plan on 1–2 weekends at the default size. It is rated intermediate, and the manual has 7 build steps after the shopping list and cut list.
Yes. You can set Patio size: 8 × 8 ft, 10 × 10 ft, 12 wide × 10 ft deep, 16 wide × 12 ft deep; Paver: 12 × 12 patio stone · grid, 16 × 16 patio stone · grid, 6 × 9 paver · running bond; Gravel base: 4″ · firm soil, mild winters, 6″ · clay or freezing winters, 8″ · deep frost or soft soil; Where: Against the house, Freestanding in the yard; Gravel and sand: Bulk, delivered by the yard, Bags, 0.5 cu ft. Change any of them and the 3D model, shopping list, cut list and step-by-step instructions are recalculated to match.
For the default size (10′ × 10′): 105 × 12″ × 12″ patio stone; 2 × Paver base (¾″-minus crushed stone), bulk, per cu yd; 0.5 × Concrete sand (coarse, washed), bulk, per cu yd; 1 × Delivery, both on one truck; 1 × Woven geotextile underlayment fabric, 4 ft × 50 ft roll; 5 × Paver edge restraint, rigid plastic, 6 ft section; 33 × 10″ × ⅜″ steel landscape spike; 1 × Polymeric joint sand, 50-lb bag; 2 × ¾″ EMT conduit, 10 ft; 1 × Plate compactor, 1-day rental. The list changes with the size you choose.
Flat spade and round-point shovel, wheelbarrow, steel rake, stakes, mason's string and a line level, 4-ft level, tape, straight 2×4 (screed), rubber mallet, push broom, garden hose with a shower nozzle, hand tamper for the corners, 3-lb hammer for the spikes, hacksaw or snips for the edging, gloves and knee pads.
Yes, and both are free. The PDF button builds a manual for the size you chose, with a 3D picture for each step, the shopping list, the cut list and a cut diagram showing which pieces come out of which board. No account is needed.
Yes. On a phone or tablet, tap View in room on this page and the finished paver patio appears in your space at real size, in whatever size you have set, using your camera (augmented reality, or AR). On a computer the same button shows a QR code to scan with your phone. The preview is approximate: placement can drift by an inch or more, so use it to get a feel for the fit, not to measure or to check that anything is safe.
No, it is not engineered. Like every plan on the site, this is a free guide that has not been designed or reviewed by an engineer, checked against a building code, or load-tested. Permit rules for a project like this vary by town, so ask your building department, and have buried utilities located before you dig (call 811 in the US). You build and use it at your own risk.
Keep building
Posts in concrete, 2×4 rails, and your choice of vertical pickets or horizontal slats.
Outdoor cushion and tool storage with a hinged slat lid. Bench height option.
Regulation or tailgate size. Folding legs on carriage bolts, finish schedule included.
A picket-skinned corral that hides 1–3 roll-out carts, with a lift-up lid so the cart lids still open.
New to building? Start with how to read a cut list and actual lumber sizes.