Skip to content

Guide · 5 min read

Choosing Screws for 2×4 and 2×6 Projects

Updated

Most projects built from 2×4s and 2×6s are held together by one kind of fastener: a construction screw driven with a cordless drill. Choosing the right one comes down to four questions. How long, what coating, does it need a pilot hole, and is a screw the right fastener at all.

Length: go through, then bury an inch or more

A screw holds with the threads that are in the second piece of wood, the one it is pulling toward. The rule of thumb: the screw should pass through the first piece and put at least 1″ of thread, ideally about 1½″, into the piece behind it, without poking out the back.

Based on actual sizes: a 2× board is 1½″ thick.
JointScrew lengthWhy
Face of a 2× into the end or edge of another 2×3″1½″ through the first board, 1½″ into the second. 2½″ is the minimum.
Two 2× boards face to face2½″The pair is 3″ thick, so a 3″ screw can break out the far side.
¾″ plywood or a 1× board onto a 2×1⅝″ to 2″Enough to bury about an inch of thread.
½″ plywood onto a 2×1¼″ to 1⅝″
Pocket holes in 1½″ stock2½″ pocket screwsCoarse thread for softwood.

For thickness, #8 screws suit light work and #9 or #10 suit frame joints in 2× lumber. A thicker screw is stronger and more likely to split a board near its end. Screws into end grain hold noticeably less than screws into the face or edge, so where a joint relies on end grain, use two screws and let the shape of the joint carry the load.

Interior or exterior

  • Indoors and dry: any construction or wood screw works, including plain zinc-plated ones.
  • Outdoors or damp: use screws sold as exterior: coated deck screws, hot-dip galvanized, or stainless steel.
  • Pressure-treated lumber: the copper in modern preservatives corrodes ordinary steel and thin zinc plating. Use fasteners labeled for treated lumber. The box will say so.
  • Cedar and redwood: plain steel leaves black streaks where it reacts with the wood. Stainless or a good coated screw avoids it.
  • Drywall screws: not for building things. They are brittle and snap under load.

Coating names and ratings differ between brands, and salt air is harder on fasteners than anything else, so read the box for where it is rated to be used.

Drive and head

Choose a star (Torx) drive over Phillips. The bit stays seated, so you strip fewer heads and can drive one-handed. Most #9 and #10 construction screws take a T25 bit, and many boxes include one. A flat or bugle head is meant to sink flush with the surface. A washer head or structural head is meant to sit on the surface and clamp, so do not bury it.

Pilot holes

Many construction screws have a self-drilling tip and go straight into the middle of a softwood board. Drill a pilot hole anyway when:

  • the screw is within a couple of inches of the end of a board, where splits start;
  • the wood is hard, dry or brittle, or the screw is thick;
  • the position has to be exact, because a screw wanders and a drill bit does not.

Size the bit to the solid core of the screw, not the threads. Hold the bit in front of the screw: you should see the threads on both sides and none of the core. For #8 to #10 screws in softwood that is about ⅛″.

If two boards will not pull tight, the threads are gripping both of them. Back the screw out, clamp the joint and drive it again, or drill a hole through the first board big enough for the screw to slip through. Screws with a smooth upper shank do this for you.

When to use structural screws, lags or bolts

Ordinary construction screws are for joining parts of a project to each other. Step up when the joint is doing something more serious.

  • Hanging weight from a wall or ceiling. A ledger, a wall-mounted bench or a ceiling rack must be fastened into the center of studs or joists, never into drywall alone, with structural wood screws or lag screws and washers. Lag screws need a pilot hole: about 3⁄16″ for a ¼″ lag and ¼″ for a ⅜″ lag in softwood. Structural screws are engineered and load-rated; follow the maker's instructions for spacing and length. The garage wall shelf plan and the overhead garage storage plan are built this way.
  • Joints that get racked, or that carry people. Table legs, bed rails and swing frames work loose over time. Use through-bolts, typically carriage bolts with a washer and nut, because they clamp the joint and can be tightened again later. The picnic table plan bolts its legs for this reason.
  • Metal connectors. Joist hangers and post bases are rated only with the fasteners their manufacturer specifies. Deck screws are not a substitute.
  • Anything covered by code. Decks, stairs, guardrails and structures attached to a house have fastening rules that vary by place. Check with your local building department.

Every plan here lists the exact fasteners in its shopping list and says where each one goes. If a step says lag, bolt or structural screw, do not swap in a deck screw.

Related: actual lumber sizes, which is where the 1½″ in every row of the table comes from, and a first-timer's tool list.

Put it to use

Plans to try this on

All plans
  • Garage Wall Shelves: 3D model of the finished build

    Garage Wall Shelves plans

    High garage shelves on 2×4 triangle brackets: a ledger screwed to every stud, an arm and a 45° brace on every other one, plywood on top.

    Level
    Intermediate
    Build time
    3–4 hours
    Materials at the default size
    ~$189
  • Overhead Garage Storage: 3D model of the finished build

    Overhead Garage Storage plans

    A ceiling-hung 2×4 platform with a plywood deck: on-edge headers lagged to the joists, bolted 2×4 hangers, room for two rows of totes.

    Level
    Advanced
    Build time
    1 day
    Materials at the default size
    ~$163
  • Picnic Table: 3D model of the finished build

    Picnic Table plans

    The classic A-frame table with attached benches: bolted legs at 30°, 2×6 top and seats.

    Level
    Intermediate
    Build time
    1 day
    Materials at the default size
    ~$163