A cut list tells you which pieces to make. A cut diagram tells you which board each piece comes out of. Read together, they turn a stack of lumber into a kit of labeled parts before you drive a single screw, which is the fastest and least wasteful way to build anything.

What a cut list says

Here is the cut list from the sawhorse plan at its default size, a pair of 36″ sawhorses:

TagPartLengthQtyCut
BBeam (on edge)36″2square
CCap (flat, on top of beam)36″2square
PBottom plate (flat, under the beam)36″2square
LLeg32⅜″816° both ends, parallel (long point to long point)
SSide stretcher32″4square
GEnd gusset19¾″4square, a little long (trim flush after)
  • Tag is a letter for the part. The same letter shows up on the cut diagram and in the build steps. Write it on each piece in pencil as it comes off the saw.
  • Length is the finished length of the piece, measured along its longest edge.
  • Qty is how many identical pieces you need for the whole project, not per assembly.
  • Cut describes the ends. “Square” means 90° across the board. Anything else is spelled out.

Angled cuts: long point to long point

When an end is cut at an angle, the board has a long edge and a short edge, so “length” needs a rule. The usual one, and the one used here, is long point to long point: the distance between the two farthest tips.

Also notice whether the two end cuts are parallel (the piece looks like a leaning parallelogram, as the sawhorse legs do) or opposed (it looks like a trapezoid, as a brace usually does). The cut list says which. Getting this backwards is the most common way to waste a board.

Reading the cut diagram

Each bar in the diagram is one board from the store, drawn to scale. The colored blocks are the pieces, labeled with their tag and length. The hatched space at the end is offcut, with the leftover length written beside it. A marker such as ×3 means: cut three boards exactly this way. Boards are grouped by size, for example all the 2×4 × 8′ boards together, with a count that should match your shopping list.

The layout is worked out by placing the longest pieces first, each on the shortest standard board that holds it (8, 10, 12 or 16 feet), then fitting shorter pieces into what is left. That is a simple, predictable method. It is usually the fewest boards, though not guaranteed to be.

Why kerf matters

A saw blade does not split wood, it removes it. The slot it leaves is the kerf, and that wood is gone as sawdust. A typical circular-saw or miter-saw blade takes about ⅛″; thin-kerf blades take a little less. The diagrams on this site allow ⅛″ for every cut between two pieces.

It sounds too small to matter until you do the sum:

  • Two 48″ pieces need 48 + ⅛ + 48 = 96⅛″. They do not fit on a 96″ board.
  • Three 32″ pieces need 96¼″. Same problem.
  • Eight 12″ blocks need seven cuts between them: 96⅞″.

A plan that ignores kerf will send you back to the store for one more board. Kerf is also why you should never mark every piece along a board and then cut down the line of marks: each cut eats part of the next piece. Measure one, cut it, then measure the next from the fresh end. And cut on the waste side of the pencil line, so the blade removes offcut rather than your piece.

At the saw

  1. Check that your boards are the length the diagram assumes, and trim a clean, square end if the factory end is rough or split.
  2. Work one board at a time, longest pieces first, following the diagram left to right.
  3. For repeated parts, clamp a stop block to your saw fence or bench and cut them all against it. Identical matters more than exact: four legs that are all 1⁄16″ long still sit flat, four legs of four lengths do not.
  4. Write the tag on every piece, and stack matching tags together.
  5. Keep the offcuts until the project is finished. They become spacers, test pieces and the part you miscut.

The diagram is a plan, not a rule. If a board has a split or a big knot where a long piece should come from, swap that piece to a better board and take the short parts from the bad one.

Related: actual lumber sizes and how to pick straight boards. Every plan, including the workbench plan and the raised garden bed plan, rebuilds its cut list and diagram for the size you choose.

Put it to use

Plans to try this on

All plans
  • Sawhorses: 3D model of the finished build

    Sawhorses plans

    The first thing to build. Three-board I-beam top, splayed legs that lock into it, sacrificial cap.

    Level
    Beginner
    Build time
    1–2 hours
    Materials at the default size
    ~$42
  • Workbench: 3D model of the finished build

    Workbench plans

    A heavy, square 2×4 bench with laminated legs, a plywood or doubled-2×4 top and a lower shelf for the stuff that ends up on the floor.

    Level
    Intermediate
    Build time
    1 day
    Materials at the default size
    ~$185
  • Raised Garden Bed: 3D model of the finished build

    Raised Garden Bed plans

    Stacked 2×6 sides on 2×4 corner posts, on the ground or up on legs.

    Level
    Beginner
    Build time
    2 hours
    Materials at the default size
    ~$89