Overhead Garage Storage Builder
Shopping list
Everything hangs on 12 lag screws into the ceiling joists, so buy good ones. Pick the straightest 2×4s for the headers and rim rails.
| Item | Qty | Each | Total |
|---|---|---|---|
| 2×4×8′ stud, untreated SPF | 11 | $3.50 | $38.50 |
| ¾″ plywood or OSB, 4×8 sheet | 1 | $52.00 | $52.00 |
| 5/16″ × 6″ hex lag screws + washers (2 spare) | 14 | $1.25 | $17.50 |
| ⅜″ × 4″ carriage bolts, nuts + washers (4 per hanger) | 24 | $1.50 | $36.00 |
| #9 × 3″ construction screws, 1-lb box | 1 | $10.00 | $10.00 |
| #8 × 1⅝″ deck screws (decking), 1-lb box | 1 | $9.00 | $9.00 |
| Total | $163.00 |
Tools: stud/joist finder, drill/driver, ⅜″, 5/16″ and 3/16″ bits (a long 3/16″ bit for the lag pilots), 1″ spade or Forstner bit, socket set, circular saw, 4′ level, two ladders, a helper, and a couple of 2×4 props (T-braces) to hold the frame up while you bolt it.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×4 × 8′
11 boards93% yieldSheet goods
- G Deck: 1 × 96″ × 48″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Designed for a light-to-moderate load (totes, seasonal gear), about 20 lb per square foot spread evenly. It is not rated for people. Prices are per board or sheet at the price you enter.
- 1
Shopping list
Everything hangs on 12 lag screws into the ceiling joists, so buy good ones. Pick the straightest 2×4s for the headers and rim rails.
Item Qty Each Total 2×4×8′ stud, untreated SPF 11 $3.50 $38.50 ¾″ plywood or OSB, 4×8 sheet 1 $52.00 $52.00 5/16″ × 6″ hex lag screws + washers (2 spare) 14 $1.25 $17.50 ⅜″ × 4″ carriage bolts, nuts + washers (4 per hanger) 24 $1.50 $36.00 #9 × 3″ construction screws, 1-lb box 1 $10.00 $10.00 #8 × 1⅝″ deck screws (decking), 1-lb box 1 $9.00 $9.00 Total $163.00 Tools: stud/joist finder, drill/driver, ⅜″, 5/16″ and 3/16″ bits (a long 3/16″ bit for the lag pilots), 1″ spade or Forstner bit, socket set, circular saw, 4′ level, two ladders, a helper, and a couple of 2×4 props (T-braces) to hold the frame up while you bolt it.
- 2
Cut list
Hangers are 27¾″: from the ceiling to the bottom of the rim rail, lapping the full height of both the header and the rim. Cut all 6 together so the platform hangs level.
Tag Part Length Qty Cut A Ceiling header 96″ 2 a full 8′ stud, uncut B Hanger 27¾″ 6 square C Rim rail (front/back) 96″ 2 a full 8′ stud, uncut E Platform joist 45″ 7 square F Sway brace 55⅞″ 2 25° off square both ends, parallel (plumb when installed); long point to long point, each edge 54¼″ G Deck (48″ wide) 96″ 1 square Cut the sway braces last, after the platform is hung and level: hold a 2×4 across the two hangers, mark the plumb lines off the hanger edges, and check against the 55⅞″ listed (long point to long point). - 3
Find the joists and hang the headers
Locate the joists with a finder and confirm each one with a thin nail through the drywall. The platform's 8′ side runs across them. Two 8′ headers, 2×4s standing on edge against the ceiling, parallel, their outside faces exactly 48″ apart (measure both ends and check the diagonals).
- Pre-drill 3/16″ up through the header and into the center of each joist; a long bit helps. Then open the hole in the header only to 5/16″ so the lag pulls the header tight to the ceiling.
- One 5/16″ × 6″ lag with a washer into every joist it crosses (6 per header, give or take one depending on where your joists land). That leaves 2″ of thread in the joist through ½″ drywall. Snug, not crushed.
- Keep at least 6″ from a garage door opener, its rail, and any light fixture.
Trusses at 24″? Lag only into the bottom chords, never the webs, and don't exceed the load. Ceiling joists that carry an attic floor already have work to do. - 4
Hangers
3 hangers per side, 27¾″ long: one flush with each end of the header and one centered. Each laps the outside face of the header with its top tight to the ceiling.
Clamp it plumb (check both ways with a level), drill two ⅜″ holes through hanger and header on a diagonal, about 1″ in from the edges, and bolt with ⅜″ × 4″ carriage bolts, heads outside, washers and nuts inside.
Where a sway brace will cross a hanger (the first two on each side), bore a 1″ counterbore ¼″ deep for each carriage-bolt head first so the brace lies flat. - 5
Lift and bolt the platform frame
Build the frame on the floor: two 8′ rim rails with 7 joists (45″) between them at 16″ on center, the last one flush with the end, two 3″ screws through the rail into each joist end. Square by the diagonals.
- With a helper, lift it between the hangers so the rims sit inside them, directly under the headers, and prop it at height with 2×4 T-braces. The bottom of each rim is flush with the bottom of the hangers.
- Level it both ways, then drill through each hanger and the rim rail and bolt with two ⅜″ carriage bolts on a diagonal, same as at the top.
- 6
Deck it
Lay the 4′ × 8′ deck on the frame and screw it to every joist and rail, 1⅝″ screws every 8″.
Hand it up in one piece with a helper, or rip it in half lengthwise on the ground if you're doing this alone (then add a joist under the seam).
- 7
Sway braces
A diagonal 2×4 on the outside face of the hangers on each long side, from the bottom of the end hanger up to the top of the next one (55⅞″ long point to long point, ends cut parallel and plumb). Three 3″ screws into each hanger.
The brace crosses that bay, so load the first 46¼″ bay from the open end of the platform.
Push the platform sideways: it should feel like part of the house.
- 8
Done
20″ of clear storage height over 6′ 8¼″ of clear space. Rated for about 640 lb spread evenly (20 lb per square foot): totes of seasonal stuff, not paint cans or tools.
Put the heavy totes over the hangers and the light ones in the middle. Check the lags for tightness after the first month.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×4 × 8′
11 boards93% yieldSheet goods
- G Deck: 1 × 96″ × 48″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Designed for a light-to-moderate load (totes, seasonal gear), about 20 lb per square foot spread evenly. It is not rated for people. Prices are per board or sheet at the price you enter.