04 · Flat-pack manual · posts, rails and pickets

Fence & Screen Builder

1 × 6′6′ tall · 2 posts · $150.56
Loading model…
1
This stepDone
1
Step 1 of 8

Shopping list

Ground-contact pressure treated (UC4A on the tag) for the posts and rails. Cedar or PT for the pickets. Check with your HOA on height before you dig; 6′ is the usual limit.

ItemQtyEachTotal
4×4×8 ground-contact PT post2$11.98$23.96
2×4×8 ground-contact PT, rails3$4.98$14.94
6′ dog-ear fence picket, ⅝″ × 5½″, PT or cedar13$2.98$38.74
2×6×8 PT, cap1$7.98$7.98
Fast-setting concrete, 50-lb bag (3 per post)6$6.25$37.50
Drainage gravel, 0.5 ft³ bag (4″ in the bottom of each hole)1$5.48$5.48
#9 × 3″ exterior screws (rated for treated lumber), 1-lb box (about 31 needed)1$10.98$10.98
#8 × 2″ exterior screws, 1-lb box (about 98 needed)1$10.98$10.98
Total$150.56

Tools: post-hole digger or auger, 4′ level, post level, string line, tape, saw, drill/driver, wheelbarrow or bucket, scrap 2×4s and stakes for bracing.

Call 811 first. Free utility locate, usually 2–3 days. Dig anyway and you own what you hit.

Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.

4×4 × 8′

2 boards100% yield
×20″

2×6 × 8′

1 board81% yield
×118½″

2×4 × 8′

3 boards71% yield
×327½″

Picket × 6′

13 boards97% yield
×132″

Posts set a third of the height or more in the ground, 24″ minimum, in fast-set concrete. Call 811 before digging. Check HOA and city limits on height; 6′ is the usual cap for side and rear yards.