Storage Shed Plans

Build a 6×8 to 8×12 gable shed on a skid floor, with every stud, truss and sheet of siding laid out and counted. Set your size below and the 3D model, shopping list, cut list and every step update to match.

Level
Advanced
Time
3–4 weekends
Materials
About $2,346
Showing8′ × 10′ gable shed · double doors9′ 9¾″ to the ridge · 6 trusses · $2,346.36
Loading model…
1
This stepDone
1
Step 1 of 12

Shopping list

Treated lumber for everything at or near the ground (skids, floor frame), ordinary kiln-dried 2×4s above the floor. The door header is cut from the same treated 2×6 as the floor frame so you don't buy a separate board. Sheet counts below come from the layouts in the cut list, not from square footage.

Permit first. A 8′ × 10′ shed is 80 ft². The model code (IRC R105.2) exempts one-story detached sheds up to 200 ft² from a building permit, but many towns set the line at 120 or even 100 ft², and zoning setbacks, HOA rules, anchoring and snow and wind requirements apply either way. This plan is not engineered for your site.
ItemQtyEachTotal
¾″ crushed gravel (¾″ minus), cubic yard, delivered (4″ deep pad, 12′ × 10′)1.5$65.00$97.50
4×4×10 pressure-treated, ground contact (skids)3$16.47$49.41
2×6×8 pressure-treated (floor frame, door header)11$7.98$87.78
2×6×10 pressure-treated (floor frame, door header)2$10.97$21.94
2×4×8 kiln-dried SPF (walls, trusses, door frames)60$3.50$210.00
2×4×10 kiln-dried SPF (walls, trusses, door frames)5$4.81$24.05
¾″ tongue-and-groove plywood subfloor, 4×8 (floor)3$52.00$156.00
T1-11 plywood siding, 19⁄32″, 4×8 (walls, gables, door skins)11$46.98$516.78
½″ CDX plywood, 4×8 (roof deck, truss gussets, header spacer)5$38.00$190.00
1×4×8 primed trim board (corners, fascia, rake, door)18$7.48$134.64
1×2×8 furring strip (door stops)3$1.98$5.94
Asphalt shingles, 3-tab or architectural, bundle (97 ft² of roof + starter and ridge caps)5$35.98$179.90
Synthetic roofing underlayment, 4′ × 250′ roll1$64.98$64.98
Drip edge, galvanized, 10′ (eaves and rakes)4$8.98$35.92
Roofing nails, 1¼″ galvanized, 5 lb1$13.98$13.98
Z-flashing, galvanized, 10′ (gable siding joints, over the door)3$9.98$29.94
Hurricane tie (H2.5A) (each end of every truss)12$1.18$14.16
Connector screws, #9 × 1½″, 100-pack (hurricane ties)1$14.98$14.98
Structural screws, 3½″ exterior, 50-pack (bottom plates through the floor into the joists)1$16.98$16.98
Construction screws, 3″ exterior, 5-lb box (framing (or 16d galvanized nails))2$38.00$76.00
Construction screws, 2½″ exterior, 1-lb box (cap plates, king to jack studs)2$11.98$23.96
Exterior screws, 2″, 5-lb box (floor, siding, roof deck (or 8d ring-shank nails))1$34.98$34.98
Exterior screws, 1¼″, 1-lb box (truss gussets)2$9.98$19.96
Exterior screws, 1⅝″, 1-lb box (door skins to their frames, door stops)1$9.98$9.98
Construction adhesive, 28-oz tube (gussets, door frames, floor)2$9.98$19.96
Auger-style earth anchor, 30″, with cable or strap (one per corner, to the skids)4$14.98$59.92
T-hinge, 8″, galvanized6$9.48$56.88
Cane bolt, 12″ (top and bottom of the fixed door)2$11.98$23.96
Hasp or locking T-handle latch1$12.98$12.98
Exterior caulk, paintable2$6.98$13.96
Exterior primer + paint, gallon3$42.98$128.94
Total$2,346.36

Tools: circular saw, speed square, drill/driver and impact driver, 4′ level, string line, tape, chalk line, framing square, hammer, utility knife, tin snips, caulk gun, plate compactor or hand tamper for the pad, two stepladders. A helper for raising walls and setting trusses.

Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.

4×4 × 10′

3 boards100% yield
×30″

2×6 × 8′

11 boards89% yield
×93″
×245″

2×6 × 10′

2 boards100% yield
×20″

2×4 × 8′

60 boards88% yield
×20″
×60″
×47″
×3015″
×42⅝″
×23⅝″
×23″
×616½″
×417¼″

2×4 × 10′

5 boards98% yield
×20″
×10″
×27″

1×4 × 8′

18 boards77% yield
×84¾″
×119½″
×222½″
×439⅛″
×141″
×246½″

1×2 × 8′

3 boards70% yield
×219″
×149½″

Sheet goods

  • F1 Floor, ¾″ T&G plywood: 1 × 96″ × 48″
  • F2 Floor, ¾″ T&G plywood: 1 × 24″ × 48″
  • F3 Floor, ¾″ T&G plywood: 1 × 48″ × 48″
  • F4 Floor, ¾″ T&G plywood: 1 × 72″ × 48″
  • S1 Wall siding panel, T1-11 siding: 8 × 91¾″ × 48″
  • S2 Wall siding panel, T1-11 siding: 2 × 91¾″ × 24″
  • S3 Gable siding: one blank makes two halves, T1-11 siding: 2 × 23⅜″ × 48″
  • S4 Door skin, T1-11 siding: 2 × 76½″ × 23¾″
  • R1 Roof deck, eave course, ½″ plywood: 2 × 73½″ × 48″
  • R2 Roof deck, eave course, ½″ plywood: 2 × 49½″ × 48″
  • R4 Roof deck, ridge course, ½″ plywood: 2 × 49½″ × 8⅞″
  • R3 Roof deck, ridge course, ½″ plywood: 2 × 73½″ × 8⅞″
  • GH Truss heel gusset, ½″ plywood: 20 × 18″ × 7½″
  • GP Truss peak gusset, ½″ plywood: 10 × 16″ × 8″
  • HS Header spacer (butted end to end between the two 2×6s), ½″ plywood: 3 × 17″ × 5½″

Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.

Framing follows ordinary prescriptive practice (2018 IRC): 2×4 studs 16″ on center under a doubled top plate, a doubled 2×6 door header on jack studs (Table R602.7(1)) and 2×4 rafters 24″ on center whose 3′–4′ run is well inside Table R802.4.1(3) at 30 psf ground snow. None of that is engineering approval. Your local code, frost depth, snow load and wind speed govern, and a permit may be required.

Community builds

Loading community builds…

The whole build on one page

How to build a storage Shed

All 12 steps for the default size (8′ × 10′ gable shed · double doors; 9′ 9¾″ to the ridge · 6 trusses). The interactive manual at the top of this page rewrites every number here for the size you choose.

  1. Step 1 of 12

    Shopping list

    Treated lumber for everything at or near the ground (skids, floor frame), ordinary kiln-dried 2×4s above the floor. The door header is cut from the same treated 2×6 as the floor frame so you don't buy a separate board. Sheet counts below come from the layouts in the cut list, not from square footage.

    Permit first. A 8′ × 10′ shed is 80 ft². The model code (IRC R105.2) exempts one-story detached sheds up to 200 ft² from a building permit, but many towns set the line at 120 or even 100 ft², and zoning setbacks, HOA rules, anchoring and snow and wind requirements apply either way. This plan is not engineered for your site.
    ItemQtyEachTotal
    ¾″ crushed gravel (¾″ minus), cubic yard, delivered (4″ deep pad, 12′ × 10′)1.5$65.00$97.50
    4×4×10 pressure-treated, ground contact (skids)3$16.47$49.41
    2×6×8 pressure-treated (floor frame, door header)11$7.98$87.78
    2×6×10 pressure-treated (floor frame, door header)2$10.97$21.94
    2×4×8 kiln-dried SPF (walls, trusses, door frames)60$3.50$210.00
    2×4×10 kiln-dried SPF (walls, trusses, door frames)5$4.81$24.05
    ¾″ tongue-and-groove plywood subfloor, 4×8 (floor)3$52.00$156.00
    T1-11 plywood siding, 19⁄32″, 4×8 (walls, gables, door skins)11$46.98$516.78
    ½″ CDX plywood, 4×8 (roof deck, truss gussets, header spacer)5$38.00$190.00
    1×4×8 primed trim board (corners, fascia, rake, door)18$7.48$134.64
    1×2×8 furring strip (door stops)3$1.98$5.94
    Asphalt shingles, 3-tab or architectural, bundle (97 ft² of roof + starter and ridge caps)5$35.98$179.90
    Synthetic roofing underlayment, 4′ × 250′ roll1$64.98$64.98
    Drip edge, galvanized, 10′ (eaves and rakes)4$8.98$35.92
    Roofing nails, 1¼″ galvanized, 5 lb1$13.98$13.98
    Z-flashing, galvanized, 10′ (gable siding joints, over the door)3$9.98$29.94
    Hurricane tie (H2.5A) (each end of every truss)12$1.18$14.16
    Connector screws, #9 × 1½″, 100-pack (hurricane ties)1$14.98$14.98
    Structural screws, 3½″ exterior, 50-pack (bottom plates through the floor into the joists)1$16.98$16.98
    Construction screws, 3″ exterior, 5-lb box (framing (or 16d galvanized nails))2$38.00$76.00
    Construction screws, 2½″ exterior, 1-lb box (cap plates, king to jack studs)2$11.98$23.96
    Exterior screws, 2″, 5-lb box (floor, siding, roof deck (or 8d ring-shank nails))1$34.98$34.98
    Exterior screws, 1¼″, 1-lb box (truss gussets)2$9.98$19.96
    Exterior screws, 1⅝″, 1-lb box (door skins to their frames, door stops)1$9.98$9.98
    Construction adhesive, 28-oz tube (gussets, door frames, floor)2$9.98$19.96
    Auger-style earth anchor, 30″, with cable or strap (one per corner, to the skids)4$14.98$59.92
    T-hinge, 8″, galvanized6$9.48$56.88
    Cane bolt, 12″ (top and bottom of the fixed door)2$11.98$23.96
    Hasp or locking T-handle latch1$12.98$12.98
    Exterior caulk, paintable2$6.98$13.96
    Exterior primer + paint, gallon3$42.98$128.94
    Total$2,346.36

    Tools: circular saw, speed square, drill/driver and impact driver, 4′ level, string line, tape, chalk line, framing square, hammer, utility knife, tin snips, caulk gun, plate compactor or hand tamper for the pad, two stepladders. A helper for raising walls and setting trusses.

  2. Step 2 of 12

    Cut list

    All studs are 81″; with one bottom plate and two top plates the walls come out 7′ 1½″, so a 4×8 sheet of siding covers the wall and laps over the floor frame in one piece. Cut one truss set first, test it on the floor, then use it as the pattern for the rest.

    Sheet layouts (each sheet is cross-cut into bands, then each band is ripped):

    • ¾″ floor, 3 sheets. 1 sheet: F1 · 1 sheet: F4 · 1 sheet: F3 | F2
    • T1-11 siding, 11 sheets (grooves run the 8′ way; keep them vertical on the wall). 8 sheets: S1 · 2 sheets: S2 + S4 · 1 sheet: S3 | S3
    • ½″ plywood, 5 sheets. 2 sheets: R1 | GH + GH + GH + GH + GH + GH · 1 sheet: R3 + R3 + R4 + R4 + GH | GH + GH + GH + GH + GH + GH · 1 sheet: R2 | GH + HS + HS + HS + GP + GP | GP + GP + GP + GP + GP · 1 sheet: R2 | GP + GP + GP
    TagPartLengthQtyCut
    ASkid, 4×4 ground-contact PT120″3square
    BRim joist, PT 2×6 (front and back)120″2square
    CFloor joist, PT 2×6, 16″ on center93″9square
    DDoor header, 2×6 (two, with the ½″ plywood spacer between)51″2square
    EBack wall plate: bottom and top120″2square
    FFront wall top plate120″1square
    GFront wall bottom plate, one each side of the door36″2square
    HCap plate, front and back walls (second top plate)113″2square
    ISide wall plate: bottom and top89″4square
    JCap plate, side walls (laps over the front and back walls)96″2square
    KWall stud, including the two king studs81″30square
    MJack stud (carries the header)75½″2square
    NTruss top chord (rafter)56⅞″12plumb cut both ends, parallel: 18.4° off square (4-in-12). Length is long point to long point
    OTruss bottom chord96″6taper both ends on the roof slope: mark 10½″ in along the top edge and cut from there to the bottom corner
    PEave blocking between trusses, inner bays22½″6square
    QEave blocking, the two end bays21¾″4square
    UDoor frame stile (flat, behind the skin)76½″4square
    VDoor frame rail (flat, between the stiles)16¾″6square
    F1Floor, ¾″ T&G plywood (48″ wide)96″1square
    F2Floor, ¾″ T&G plywood (48″ wide)24″1square
    F3Floor, ¾″ T&G plywood (48″ wide)48″1square
    F4Floor, ¾″ T&G plywood (48″ wide)72″1square
    S1Wall siding panel, T1-11 siding (48″ wide)91¾″8notch for the door where it crosses the opening
    S2Wall siding panel, T1-11 siding (24″ wide)91¾″2square
    S3Gable siding: one blank makes two halves, T1-11 siding (48″ wide)23⅜″2rip corner to corner on the roof slope: each half is 3¾″ at the eave, 19¾″ at the peak
    S4Door skin, T1-11 siding (23¾″ wide)76½″2square
    R1Roof deck, eave course, ½″ plywood (48″ wide)73½″2square
    R2Roof deck, eave course, ½″ plywood (48″ wide)49½″2square
    R4Roof deck, ridge course, ½″ plywood (8⅞″ wide)49½″2square
    R3Roof deck, ridge course, ½″ plywood (8⅞″ wide)73½″2square
    GHTruss heel gusset, ½″ plywood (7½″ wide)18″20trim the top to the roof line
    GPTruss peak gusset, ½″ plywood (8″ wide)16″10clip both top corners to the roof line
    HSHeader spacer (butted end to end between the two 2×6s), ½″ plywood (5½″ wide)17″3square
    T1Corner trim, 1×4 (stops ½″ below the wall top to clear the rafter tails)91¼″8square
    T2aFascia, 1×4 (joint on a rafter tail)73½″2square
    T2bFascia, 1×4 (joint on a rafter tail)49½″2square
    T3Rake trim, 1×456⅞″4plumb cut both ends like the rafters
    T4Drip cap board over the door, 1×455″1square
    T5Astragal on the active door, 1×4 (laps the other door)76½″1square
    XDoor stop, 1×2, on each jack stud77″2square
    YDoor stop, 1×2, under the header46½″1square
    Truss pattern: each top chord is 56⅞″ long point to long point with both ends cut 18.4° off square (set the speed square to 4 on the common scale). The bottom chord is a full 8′ with a long taper on each end. Laid out on the floor, the peak is 19¾″ above the bottom edge of the bottom chord.
  3. Step 3 of 12

    Gravel pad, skids and anchors

    Pick a spot that drains, inside your setbacks, and call 811 before digging. Strip the sod from a 12′ × 10′ rectangle (a foot bigger than the shed all round), lay landscape fabric if you like, and fill it with 4″ of crushed gravel in two lifts, tamping each. Finish about 2″ above the lawn, flat and level both ways: check with a straight 2×4 and the 4′ level.

    • Lay the 3 skids on the gravel, parallel to the door wall: the outer two 8″ in from the front and back edges of the floor, the third centered. Level them to each other by adding or scraping gravel, never by shimming with wood.
    • Check the skids for square: ends lined up, and the two diagonals across the outer skids equal.
    • Screw an earth anchor into the ground at each end of the two outer skids, just off the end grain. Strap or cable each one to its skid after the floor frame is on. An empty shed is a sail; anchors are what keep it on the pad.
    A gravel pad with skids is a floating foundation: it rises and falls with frost. That is normal for a small detached shed, but some jurisdictions require footings below frost depth or a slab, especially over 120–200 ft² or in high-wind zones. Ask.
  4. Step 4 of 12

    Floor frame

    Build the floor frame on top of the skids from treated 2×6. The two 10′ rim joists run along the front and back; 9 joists 93″ long fit between them, 16″ on center measured from the left end, with the last one flush at the right end.

    • Mark both rims at once so the layouts match. Drive three 3″ screws through the rim into the end of each joist.
    • Square the frame: the diagonals should both be 153⅝″. Then center it on the skids and toe-screw every joist to every skid, one 3″ screw from each side.
    • Tension the anchor straps to the outer skids.
  5. Step 5 of 12

    Floor sheathing

    Lay the ¾″ tongue-and-groove plywood with the long edge across the joists, starting flush at the front left corner. The end joints land on the center of a joist and are staggered between the two rows.

    • Front row (48″ wide): 96″ + 24″. Back row (48″ wide): 48″ + 72″.
    • Run a bead of construction adhesive on each joist, then 2″ screws every 6″ along the sheet edges and every 12″ in the field.
    • Snap chalk lines over the joists first so the screws find them.
    The finished floor is your workbench for the next steps: flat, square and big enough to frame walls and trusses on.
  6. Step 6 of 12

    Front and back walls

    Frame each wall flat on the floor, then tip it up. Studs are 81″, 16″ on center from the left end, between a bottom plate and a top plate; drive two 3″ screws through each plate into each stud end.

    • Back wall: 9 studs between two 10′ plates.
    • Front wall: the door opening is 48″ wide, centered. The bottom plate is two 36″ pieces, one each side of the door; the top plate runs the full 10′. Each side of the opening gets a full-height king stud with a 75½″ jack stud screwed to its face (2½″ screws, two every 12″, staggered).
    • Header: two 51″ 2×6s with the ½″ plywood spacer sandwiched between (3″ screws from both faces, 12″ apart) make a header exactly as thick as the wall. It sits on the two jack studs, tight under the top plate. Screw through each king stud into the header ends (four 3″ screws) and down through the top plate into it.
    • Screw a scrap 2×4 across the bottom of the door opening, on the inside face of the jack studs, to hold the spacing while you raise the wall; take it off once the wall is fastened.
    • Stand each wall flush with the edge of the floor and fasten the bottom plate with 3½″ structural screws through the plywood into the rim joist, one between each pair of studs. Plumb the wall and prop it with a diagonal 2×4 screwed to a stud and to a block on the floor.
    Header check (2018 IRC Table R602.7(1), roof and ceiling only, building up to 12′ wide): a doubled 2×6 on one jack stud each end spans 6′ at 30 psf ground snow, 5′ 1″ at 50 psf and 4′ 6″ at 70 psf. This opening is 4′. Heavier snow than that needs a bigger header: ask your building department.
  7. Step 7 of 12

    Side walls and cap plates

    The two side walls fit between the front and back walls, so their plates are 89″. Each has 7 studs: one at each end, the rest on the 16″ layout measured from the outside of the front wall.

    • Stand each side wall, fasten its bottom plate through the floor into the end joist, then screw its end studs to the end studs of the front and back walls with 3″ screws every 16″.
    • Cap plates tie the corners together: the side-wall caps are a full 8′ and lap over the front and back walls; the front and back caps (113″) fit between them. Fasten the caps with 2½″ screws every 16″ and three at each lap. 3″ screws would come through.
    • Check every wall for plumb and the top plates for straight with a string line, and leave the diagonal braces on until the siding is nailed off.
  8. Step 8 of 12

    Build and set the trusses

    6 identical trusses, 24″ on center. Each is two 56⅞″ top chords and a 8′ bottom chord, all in one plane, held together by ½″ plywood gussets glued and screwed over the three joints. Build them flat (the shed floor is the best jig, so many builders make the trusses before the walls go up and stack them aside).

    • Screw scrap blocks to the floor around the first truss so every one comes out the same. The top chords meet in a plumb cut at the peak; each one sits on the tapered end of the bottom chord and runs past it to form the eave.
    • Gussets: one at each heel and one at the peak, on both faces of the 4 inner trusses and on the inside face only of the two end trusses, so the gable siding lies flat (20 heel and 10 peak gussets). Construction adhesive, then 1¼″ screws about 3″ apart into every member. Trim the gussets flush with the top of the rafters. The model draws them as plain rectangles.
    • Set the two end trusses first, flush with the outside of the side walls, and brace them plumb. Stretch a string between their peaks and set the rest to it, 24″ on center from the left end.
    • Fasten each truss with a hurricane tie at both ends plus a 3″ toe-screw, then screw the 2×4 blocking on edge between the trusses along both eaves, flush with the outside of the wall. The blocking keeps the trusses upright and closes the eave.
    Site-built gusseted trusses are standard shed practice but they are not in the prescriptive code tables. For scale: a plain 2×4 SPF No. 2 rafter at 24″ on center is listed for a 6′ 8″ run at 30 psf ground snow (2018 IRC Table R802.4.1(3)); these run 4′, and every pair has its own tie. Deep-snow and high-wind areas often require engineered trusses or closer spacing.
  9. Step 9 of 12

    Siding

    T1-11 plywood is siding and wall bracing in one. Hang the sheets with the grooves vertical, bottom edge flush with the bottom of the rim joist, top edge at the top of the wall (91¾″). Lay out each wall's sheets from the same end as its studs so the joints land on a stud: the front and back walls from the left end as you face the door, the side walls from the front corner.

    • 2″ screws or 8d galvanized ring-shank nails every 6″ around each sheet's edges and every 12″ on the studs in between. Leave a ⅛″ gap at joints that don't have a shiplap edge.
    • Front wall: hang full sheets across the door opening and cut the opening out afterwards with the saw riding along the jack studs and header, or notch each sheet first. The strip above the door nails to the header.
    • Gables: lay Z-flashing on the top edge of the wall sheets, then fit the gable pieces above it. Each half is 3¾″ tall at the eave and 19¾″ at the peak; two halves come out of one 23⅜″ × 48″ blank ripped on the diagonal. Nail to the end truss.
    • Now the walls are braced: take the temporary props off.
  10. Step 10 of 12

    Roof deck and shingles

    Sheathe each slope from the eave up with the ½″ plywood, long edge across the trusses. The deck runs 1½″ past the framing at each gable end so it covers the siding and rake trim: 10′ 3″ overall.

    • Eave course: full 48″ wide sheets, 73½″ + 49½″. Ridge course: 8⅞″ rips, 49½″ + 73½″, so the joints are staggered. Every end joint lands on a truss.
    • 2″ screws or 8d nails every 6″ on the edges, 12″ in the field. Leave ⅛″ between sheets.
    • Fascia and rake trim go on before the roofing (next step shows them), so the drip edge can lap over them.
    • Roofing order: drip edge along the eaves, underlayment, drip edge up the rakes over the underlayment, starter strip, shingles with the offset printed on the wrapper, then ridge caps. Four 1¼″ roofing nails per shingle, six in windy areas.
    Work from a ladder at the eaves and from the plywood only when it is fully nailed. A 4-in-12 roof feels walkable and is still a fall from 8′.
  11. Step 11 of 12

    Trim and doors

    Trim covers the open corners and the sheet edges. Prime the cut ends before they go up.

    • Corners: two 91¼″ 1×4s at each corner, the front or back board lapping over the edge of the side board. 2″ screws or 8d finish nails into the corner studs.
    • Fascia across the rafter tails (joint on a tail) and rake trim up each gable, tucked under the roof deck. Fit these before the drip edge.
    • Doors: glue and screw a flat 2×4 frame to the back of each 23¾″ × 76½″ skin, flush with its edges: two full-height stiles with three 16¾″ rails between them (bottom, middle, top). Drive 1⅝″ screws through the skin into the frame every 8″.
    • Hang each door on three T-hinges with ⅛″ clearance at the sides and ¼″ top and bottom: the hinge plate screws through the siding into the king and jack studs (2½″ screws), the strap through the skin into the stile.
    • Door stops: 1×2 strips on the jack studs and under the header, set 1½″ back from the face of the framing so the closed door sits flush with the siding.
    • Screw the 1×4 astragal to the door you'll open first so it laps the other by half its width. Cane bolts top and bottom hold the fixed door; the hasp goes on the astragal.
    • Screw the 1×4 drip cap board over the door with a piece of Z-flashing on top, caulk the trim joints, and paint everything, especially the bottom edges of the siding.
  12. Step 12 of 12

    Done

    80 ft² of dry storage with a 48″ × 77″ door and 7′ 1½″ walls. Check the anchor straps once a year and after any big wind, and keep the gravel a few inches below the siding so it can dry.

    The floor is about 12″ above the pad. A short ramp of treated 2×6 on 2×4 stringers, hooked over the rim joist, gets a mower in. Wall shelves screw straight into the studs; nothing heavy should hang from the trusses.

Questions

Storage Shed plan FAQ

Answers come straight from this plan's own numbers at its default size.

How much does it cost to build a storage Shed?

At the default size (8′ × 10′ gable shed · double doors), the shopping list comes to $2,346.36. That uses the site's default prices (lumber at Home Depot prices in Dallas–Fort Worth, November 2026) and typical prices for hardware and other materials. Enter what your store charges and the total updates for your size and your prices.

How long does it take to build a storage Shed?

Plan on 3–4 weekends at the default size. It is rated advanced, and the manual has 10 build steps after the shopping list and cut list.

Can I change the size of this storage shed plan?

Yes. You can set Size (depth × length): 6′ × 8′ · 48 ft², 8′ × 10′ · 80 ft², 8′ × 12′ · 96 ft²; Door: Single door, 36″ opening, Double doors, 48″ opening. Change any of them and the 3D model, shopping list, cut list and step-by-step instructions are recalculated to match.

What materials do I need?

For the default size (8′ × 10′ gable shed · double doors): 1.5 × ¾″ crushed gravel (¾″ minus), cubic yard, delivered; 3 × 4×4×10 pressure-treated, ground contact; 11 × 2×6×8 pressure-treated; 2 × 2×6×10 pressure-treated; 60 × 2×4×8 kiln-dried SPF; 5 × 2×4×10 kiln-dried SPF; 3 × ¾″ tongue-and-groove plywood subfloor, 4×8; 11 × T1-11 plywood siding, 19⁄32″, 4×8; 5 × ½″ CDX plywood, 4×8; 18 × 1×4×8 primed trim board; 3 × 1×2×8 furring strip; 5 × Asphalt shingles, 3-tab or architectural, bundle; 1 × Synthetic roofing underlayment, 4′ × 250′ roll; 4 × Drip edge, galvanized, 10′; 1 × Roofing nails, 1¼″ galvanized, 5 lb; 3 × Z-flashing, galvanized, 10′; 12 × Hurricane tie (H2.5A); 1 × Connector screws, #9 × 1½″, 100-pack; 1 × Structural screws, 3½″ exterior, 50-pack; 2 × Construction screws, 3″ exterior, 5-lb box; 2 × Construction screws, 2½″ exterior, 1-lb box; 1 × Exterior screws, 2″, 5-lb box; 2 × Exterior screws, 1¼″, 1-lb box; 1 × Exterior screws, 1⅝″, 1-lb box; 2 × Construction adhesive, 28-oz tube; 4 × Auger-style earth anchor, 30″, with cable or strap; 6 × T-hinge, 8″, galvanized; 2 × Cane bolt, 12″; 1 × Hasp or locking T-handle latch; 2 × Exterior caulk, paintable; 3 × Exterior primer + paint, gallon. The list changes with the size you choose.

What tools do I need?

Circular saw, speed square, drill/driver and impact driver, 4′ level, string line, tape, chalk line, framing square, hammer, utility knife, tin snips, caulk gun, plate compactor or hand tamper for the pad, two stepladders. A helper for raising walls and setting trusses.

Is there a printable PDF and cut list?

Yes, and both are free. The PDF button builds a manual for the size you chose, with a 3D picture for each step, the shopping list, the cut list and a cut diagram showing which pieces come out of which board. No account is needed.

Can I see it in my room before I build it?

Yes. On a phone or tablet, tap View in room on this page and the finished storage shed appears in your space at real size, in whatever size you have set, using your camera (augmented reality, or AR). On a computer the same button shows a QR code to scan with your phone. The preview is approximate: placement can drift by an inch or more, so use it to get a feel for the fit, not to measure or to check that anything is safe.

Is this storage shed plan engineered, and do I need a permit?

No, it is not engineered. Like every plan on the site, this is a free guide that has not been designed or reviewed by an engineer, checked against a building code, or load-tested. You may well need a permit: a structure like this is often covered by local building code, zoning, setback and HOA rules, and those differ from place to place. Ask your building department before you buy materials. You build and use it at your own risk.

Keep building

All outdoor & patio plans
  • Adirondack Chair: 3D model of the finished build

    Adirondack Chair plans

    The low, reclined porch classic with wide flat arms, built from dimensional lumber with straight cuts only.

    Level
    Advanced
    Build time
    1 day per chair
    Materials at the default size
    ~$129
  • Pergola: 3D model of the finished build

    Pergola plans

    A freestanding pergola from 8×8 to 12×16: posts in concrete, doubled beams, 2×6 rafters with shaped tails and optional 2×2 purlins.

    Level
    Advanced
    Build time
    2–3 weekends
    Materials at the default size
    ~$1,267
  • Floating Deck: 3D model of the finished build

    Floating Deck plans

    A low, freestanding deck from 8×8 to 12×16: deck blocks, doubled 2×8 beams and joists sized from the AWC span tables, with a picture-frame and fascia option.

    Level
    Advanced
    Build time
    2 weekends
    Materials at the default size
    ~$856
  • Lean-To Shed: 3D model of the finished build

    Lean-To Shed plans

    A single-slope garden tool shed from 4×8 to 8×12: tall front wall with the door, low back wall, rafters sized from the code span table for your snow load, plywood siding, and a skid floor or a paver floor.

    Level
    Advanced
    Build time
    2–4 weekends
    Materials at the default size
    ~$1,728

New to building? Start with how to read a cut list and actual lumber sizes.