42 · Flat-pack manual · post & beam construction

Pergola Builder

10′ × 12′ pergola4 6×6 posts · doubled 2×10 beams · $1,323.65
Loading model…
1
This stepDone
1
Step 1 of 8

Shopping list

Everything ground-contact pressure-treated. The posts and beams are the long-lead items; many yards order 6×6s and long 2×10s in, so call ahead.

Above 10′ × 10′ this always uses 6×6 posts: 4×4s this tall on a footprint this big sway and twist.
ItemQtyEachTotal
6×6×12 pressure-treated, ground contact (posts)4$64.98$259.92
6×6×8 pressure-treated (knee braces)2$43.32$86.64
2×10×16 pressure-treated (beams)4$40.34$161.35
2×6×12 pressure-treated (rafters)12$16.35$196.24
2×2×8 pressure-treated (purlins)27$3.98$107.46
Fast-setting concrete, 50 lb (10 per hole)40$6.48$259.20
All-purpose gravel, 0.5 cu ft (6″ under each post, 2 per hole)8$5.48$43.84
½″ × 10″ galvanized carriage bolt, nut & 2 washers (beams, brace tops)12$5.48$65.76
⅜″ × 6″ structural screws, 12-pack (brace feet)1$16.98$16.98
Galvanized hurricane tie (H2.5A)24$1.18$28.32
Connector screws #9 × 1½″, 1-lb box (hurricane ties)1$14.98$14.98
3″ exterior deck screws, 5-lb box (rafters, purlins · about 192)1$39.98$39.98
Exterior stain / sealer, 1 gal (after the PT dries)1$42.98$42.98
Total$1,323.65

Tools: post-hole digger or rented auger, digging bar, string line and stakes, 4′ level, post level, circular saw, jigsaw (rafter tails), drill/driver, ½″ × 12″ bit, socket set, two tall ladders, clamps, wheelbarrow. Two or three helpers for the beams.

Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.

2×10 × 16′

4 boards94% yield
×412″

2×6 × 12′

12 boards99% yield
×121″

2×2 × 8′

27 boards83% yield
×1214″
×1215¾″
×26¾″
×160⅜″

Posts are buried 36″ in concrete with gravel under them, beams sandwich the posts with through-bolts, and 45° knee braces stop the frame racking along the beams (across the width, the posts' 36″ concrete footings do that job). Beam tops sit at 8′ 8″: a 12′ post minus 36″ in the ground and 4″ to cut level in place, for about 8′ of clear headroom under 2×8 beams (7′ 10¾″ under 2×10s). Check your frost depth and setbacks, and call 811 before you dig.