Sawhorses plans
The first thing to build. Three-board I-beam top, splayed legs that lock into it, sacrificial cap.
- Level
- Beginner
- Build time
- 1–2 hours
- Materials at the default size
- ~$42
Plan 84 · free 3D guide, cut list and PDF
Build a wall-hung plywood organizer: drills hang in slots, chargers sit on an open shelf above, hung on a French cleat or studs. Set your size below and the 3D model, shopping list, cut list and every step update to match.
Sanded ¾″ plywood: birch, or a flat BC pine panel. Everything comes out of a 4′ × 4′ half sheet, which most stores sell as a project panel for a little over half the price of a full sheet; the list prices a full sheet so you can use the price you know.
Buy a power strip with a switch, a built-in breaker and a UL or ETL mark, with a cord long enough to reach the outlet without an extension cord.
| Item | Qty | Each | Total |
|---|---|---|---|
| ¾″ × 4×8 plywood, sanded (a 4×4 half sheet is enough) | 1 | $52.00 | $52.00 |
| #8 × 1¾″ wood screws, 100-pack (box and back: about 50) | 1 | $8.98 | $8.98 |
| #8 × 1¼″ wood screws, 50-pack (cleat and spacer to the back, from inside) | 1 | $5.48 | $5.48 |
| ¼″ × 3½″ washer-head structural screws (wall cleat: 2 per stud; plus 1 per stud through the bottom of the back) | 6 | $0.98 | $5.88 |
| Wood glue, 8 oz | 1 | $4.98 | $4.98 |
| Power strip, 6-outlet, switched, with breaker, 6′ cord (screws to the outside of one side) | 1 | $12.98 | $12.98 |
| Adhesive cable clips, 10-pack (cord management) | 1 | $4.98 | $4.98 |
| Water-based polyurethane, ½ pt | 1 | $11.98 | $11.98 |
| Total | $107.26 |
Tools: circular saw with a straightedge guide (or table saw), jigsaw, drill/driver, ⅛″ pilot bit and countersink, a Forstner or spade bit the width of your slots, 1½″ hole saw or spade bit for the cord hole, clamps, square, stud finder, level, sandpaper.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Everything is ¾″ plywood, glued and screwed. The drawing puts the hanger shelf 54″ off the floor and assumes studs 16″ on center; hang yours at whatever height suits your reach, on your own studs. Chargers sit on an open-topped shelf on purpose: read the ventilation and charging notes in the last two steps and in your charger's manual.
Loading community builds…
Sanded ¾″ plywood: birch, or a flat BC pine panel. Everything comes out of a 4′ × 4′ half sheet, which most stores sell as a project panel for a little over half the price of a full sheet; the list prices a full sheet so you can use the price you know.
Buy a power strip with a switch, a built-in breaker and a UL or ETL mark, with a cord long enough to reach the outlet without an extension cord.
| Item | Qty | Each | Total |
|---|---|---|---|
| ¾″ × 4×8 plywood, sanded (a 4×4 half sheet is enough) | 1 | $52.00 | $52.00 |
| #8 × 1¾″ wood screws, 100-pack (box and back: about 50) | 1 | $8.98 | $8.98 |
| #8 × 1¼″ wood screws, 50-pack (cleat and spacer to the back, from inside) | 1 | $5.48 | $5.48 |
| ¼″ × 3½″ washer-head structural screws (wall cleat: 2 per stud; plus 1 per stud through the bottom of the back) | 6 | $0.98 | $5.88 |
| Wood glue, 8 oz | 1 | $4.98 | $4.98 |
| Power strip, 6-outlet, switched, with breaker, 6′ cord (screws to the outside of one side) | 1 | $12.98 | $12.98 |
| Adhesive cable clips, 10-pack (cord management) | 1 | $4.98 | $4.98 |
| Water-based polyurethane, ½ pt | 1 | $11.98 | $11.98 |
| Total | $107.26 |
Tools: circular saw with a straightedge guide (or table saw), jigsaw, drill/driver, ⅛″ pilot bit and countersink, a Forstner or spade bit the width of your slots, 1½″ hole saw or spade bit for the cord hole, clamps, square, stud finder, level, sandpaper.
The sides and all the shelves are 10″ wide: rip that width at one fence setting. A layout for the sheet follows the list.
| Tag | Part | Length | Qty | Cut |
|---|---|---|---|---|
| A | Back (21¾″ wide) | 23½″ | 1 | dead square: it squares the box |
| B | Side (10″ wide) | 21¾″ | 2 | one gets a 1½″ cord hole (step 3) |
| C | Hanger shelf (10″ wide) | 22″ | 1 | 4 slots 1¾″ × 5″ from the front edge (step 3) |
| D | Charger shelf (10″ wide) | 22″ | 1 | square |
| E | Bit shelf (10″ wide) | 22″ | 1 | square |
| F | Bit-shelf lip (2″ wide) | 22″ | 1 | square |
| G | French cleat blank (5¼″ wide) | 23½″ | 1 | rip down the middle at 45° into two matching halves, each 3″ on its wide face |
| H | Spacer strip (3″ wide) | 23½″ | 1 | square |
One way to cut it from a 4′ × 4′ half sheet: rip these strips off the 4′ length, then crosscut each one.
| Rip width | Strips | Cut into |
|---|---|---|
| 21¾″ | 1 | 1 × back, 1 × hanger shelf, 1 × charger shelf |
| 10″ | 2 | 1 × bit shelf, 2 × side, 1 × cleat blank, 1 × spacer |
| 2″ | 1 | 1 × lip |
Slots first, while the hanger shelf is loose. 4 slots, 1¾″ wide and 5″ deep, cut in from the front edge. Mark the centers from the left end of the shelf:
| Slot | Center from the left end |
|---|---|
| 1 | 2¾″ |
| 2 | 8¼″ |
| 3 | 13¾″ |
| 4 | 19¼″ |
Now the box. The shelves go between the sides, rear edges flush. Measured from the bottom end of the sides to the underside of each shelf: bit shelf 0 (flush), hanger shelf 11¾″, charger shelf 17½″. The sides stand 3.5″ above the charger shelf.
Lay the box face down. The 23½″ × 21¾″ back covers the whole rear, flush all round.
Sand, ease all the edges, and put on two coats of water-based polyurethane now, while you can still lay it flat. Let it cure fully before chargers go on it.
Rip the 23½″ × 5¼″ blank down the middle with the saw tilted 45°. You get two identical strips, 3″ on the wide face and 2¼″ on the narrow one.
The wall half of the cleat goes up wide face to the room, narrow face on the wall, bevel on top sloping down toward the wall, so there is a V-shaped groove behind it for the station's half to drop into.
The power strip screws to the outside of the side with the cord hole, switch up, where you can reach it and where nothing can pile up on it.
4 tools hang handle-down in the slots, motor housing on the shelf, chuck toward you. Bit cases and drivers go on the lower shelf. About 3 chargers fit on top.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Everything is ¾″ plywood, glued and screwed. The drawing puts the hanger shelf 54″ off the floor and assumes studs 16″ on center; hang yours at whatever height suits your reach, on your own studs. Chargers sit on an open-topped shelf on purpose: read the ventilation and charging notes in the last two steps and in your charger's manual.
Before you build. This plan is a free guide. It is not an engineered, code-reviewed or load-tested design. Check every measurement against your own space and materials, follow your tools' manuals, and stop and ask a licensed professional if you are unsure. You build and use it at your own risk. Full disclaimer: /disclaimer on the site.
The whole build on one page
All 8 steps for the default size (4 slots · 23½″ wide × 21¾″ tall × 11½″ deep; 1¾″ slots · bit shelf · French cleat). The interactive manual at the top of this page rewrites every number here for the size you choose.
Step 1 of 8
Sanded ¾″ plywood: birch, or a flat BC pine panel. Everything comes out of a 4′ × 4′ half sheet, which most stores sell as a project panel for a little over half the price of a full sheet; the list prices a full sheet so you can use the price you know.
Buy a power strip with a switch, a built-in breaker and a UL or ETL mark, with a cord long enough to reach the outlet without an extension cord.
| Item | Qty | Each | Total |
|---|---|---|---|
| ¾″ × 4×8 plywood, sanded (a 4×4 half sheet is enough) | 1 | $52.00 | $52.00 |
| #8 × 1¾″ wood screws, 100-pack (box and back: about 50) | 1 | $8.98 | $8.98 |
| #8 × 1¼″ wood screws, 50-pack (cleat and spacer to the back, from inside) | 1 | $5.48 | $5.48 |
| ¼″ × 3½″ washer-head structural screws (wall cleat: 2 per stud; plus 1 per stud through the bottom of the back) | 6 | $0.98 | $5.88 |
| Wood glue, 8 oz | 1 | $4.98 | $4.98 |
| Power strip, 6-outlet, switched, with breaker, 6′ cord (screws to the outside of one side) | 1 | $12.98 | $12.98 |
| Adhesive cable clips, 10-pack (cord management) | 1 | $4.98 | $4.98 |
| Water-based polyurethane, ½ pt | 1 | $11.98 | $11.98 |
| Total | $107.26 |
Tools: circular saw with a straightedge guide (or table saw), jigsaw, drill/driver, ⅛″ pilot bit and countersink, a Forstner or spade bit the width of your slots, 1½″ hole saw or spade bit for the cord hole, clamps, square, stud finder, level, sandpaper.
Step 2 of 8
The sides and all the shelves are 10″ wide: rip that width at one fence setting. A layout for the sheet follows the list.
| Tag | Part | Length | Qty | Cut |
|---|---|---|---|---|
| A | Back (21¾″ wide) | 23½″ | 1 | dead square: it squares the box |
| B | Side (10″ wide) | 21¾″ | 2 | one gets a 1½″ cord hole (step 3) |
| C | Hanger shelf (10″ wide) | 22″ | 1 | 4 slots 1¾″ × 5″ from the front edge (step 3) |
| D | Charger shelf (10″ wide) | 22″ | 1 | square |
| E | Bit shelf (10″ wide) | 22″ | 1 | square |
| F | Bit-shelf lip (2″ wide) | 22″ | 1 | square |
| G | French cleat blank (5¼″ wide) | 23½″ | 1 | rip down the middle at 45° into two matching halves, each 3″ on its wide face |
| H | Spacer strip (3″ wide) | 23½″ | 1 | square |
One way to cut it from a 4′ × 4′ half sheet: rip these strips off the 4′ length, then crosscut each one.
| Rip width | Strips | Cut into |
|---|---|---|
| 21¾″ | 1 | 1 × back, 1 × hanger shelf, 1 × charger shelf |
| 10″ | 2 | 1 × bit shelf, 2 × side, 1 × cleat blank, 1 × spacer |
| 2″ | 1 | 1 × lip |
Step 3 of 8
Slots first, while the hanger shelf is loose. 4 slots, 1¾″ wide and 5″ deep, cut in from the front edge. Mark the centers from the left end of the shelf:
| Slot | Center from the left end |
|---|---|
| 1 | 2¾″ |
| 2 | 8¼″ |
| 3 | 13¾″ |
| 4 | 19¼″ |
Now the box. The shelves go between the sides, rear edges flush. Measured from the bottom end of the sides to the underside of each shelf: bit shelf 0 (flush), hanger shelf 11¾″, charger shelf 17½″. The sides stand 3.5″ above the charger shelf.
Step 4 of 8
Lay the box face down. The 23½″ × 21¾″ back covers the whole rear, flush all round.
Sand, ease all the edges, and put on two coats of water-based polyurethane now, while you can still lay it flat. Let it cure fully before chargers go on it.
Step 5 of 8
Rip the 23½″ × 5¼″ blank down the middle with the saw tilted 45°. You get two identical strips, 3″ on the wide face and 2¼″ on the narrow one.
Step 6 of 8
The wall half of the cleat goes up wide face to the room, narrow face on the wall, bevel on top sloping down toward the wall, so there is a V-shaped groove behind it for the station's half to drop into.
Step 7 of 8
The power strip screws to the outside of the side with the cord hole, switch up, where you can reach it and where nothing can pile up on it.
Step 8 of 8
4 tools hang handle-down in the slots, motor housing on the shelf, chuck toward you. Bit cases and drivers go on the lower shelf. About 3 chargers fit on top.
Questions
Answers come straight from this plan's own numbers at its default size.
At the default size (4 slots · 23½″ wide × 21¾″ tall × 11½″ deep), the shopping list comes to $107.26. That uses the site's default prices (lumber at Home Depot prices in Dallas–Fort Worth, November 2026) and typical prices for hardware and other materials. Enter what your store charges and the total updates for your size and your prices.
Plan on half a day at the default size. It is rated beginner, and the manual has 6 build steps after the shopping list and cut list.
Yes. You can set Tool slots: 2, 3, 4, 5, 6; Slot width: 1½″ · slim handles, 1¾″ · most 18–20 V tools, 2″ · thick grips; Shelf depth: 8″ · compact chargers, 10″ · standard; Lower shelf for bits: Yes, No; Mounting: French cleat, Screwed straight to the studs. Change any of them and the 3D model, shopping list, cut list and step-by-step instructions are recalculated to match.
For the default size (4 slots · 23½″ wide × 21¾″ tall × 11½″ deep): 1 × ¾″ × 4×8 plywood, sanded; 1 × #8 × 1¾″ wood screws, 100-pack; 1 × #8 × 1¼″ wood screws, 50-pack; 6 × ¼″ × 3½″ washer-head structural screws; 1 × Wood glue, 8 oz; 1 × Power strip, 6-outlet, switched, with breaker, 6′ cord; 1 × Adhesive cable clips, 10-pack; 1 × Water-based polyurethane, ½ pt. The list changes with the size you choose.
Circular saw with a straightedge guide (or table saw), jigsaw, drill/driver, ⅛″ pilot bit and countersink, a Forstner or spade bit the width of your slots, 1½″ hole saw or spade bit for the cord hole, clamps, square, stud finder, level, sandpaper.
Yes, and both are free. The PDF button builds a manual for the size you chose, with a 3D picture for each step, the shopping list, the cut list and a cut diagram showing which pieces come out of which board. No account is needed.
Yes. On a phone or tablet, tap View in room on this page and the finished drill charging station appears in your space at real size, in whatever size you have set, using your camera (augmented reality, or AR). On a computer the same button shows a QR code to scan with your phone. The preview is approximate: placement can drift by an inch or more, so use it to get a feel for the fit, not to measure or to check that anything is safe.
No, it is not engineered. Like every plan on the site, this is a free guide that has not been designed or reviewed by an engineer, checked against a building code, or load-tested. A project like this does not usually involve a building permit, but rules vary, and anything attached to a house, set in the ground or wired can be different, so check locally if you are unsure. How much it holds depends on the wall or ceiling you fasten it to; any load figure in the plan is an estimate, not a rating. You build and use it at your own risk.
Keep building
The first thing to build. Three-board I-beam top, splayed legs that lock into it, sacrificial cap.
A 2×4-framed shop cart with plywood shelves, locking casters and an optional push handle.
A heavy, square 2×4 bench with laminated legs, a plywood or doubled-2×4 top and a lower shelf for the stuff that ends up on the floor.
Two 2×4 wing benches with a dropped saw platform between them, so long boards ride dead level with the saw table on both sides.
New to building? Start with how to read a cut list and actual lumber sizes.