Bunk Bed plans
A twin-over-twin bunk bed with through-bolted rails, guard rails on all four sides of the top bunk, a built-in ladder and a wall anchor.
- Level
- Advanced
- Build time
- 2 days
- Materials at the default size
- ~$392
Plan 61 · free 3D guide, cut list and PDF
Build a backyard playhouse with stud walls, an open doorway and windows and a shingled gable roof, anchored to the ground and sized for kids 2 to 8. Set your size below and the 3D model, shopping list, cut list and every step update to match.
The floor frame is pressure-treated (today's ACQ or copper-azole treatment; never old CCA lumber, railroad ties or anything creosoted). Everything above the floor is ordinary kiln-dried framing lumber and plywood, kept dry by paint and the roof. Buy smooth-faced exterior plywood (BC or ACX), not grooved siding: the panels run both upright and sideways. Pick straight studs.
| Item | Qty | Each | Total |
|---|---|---|---|
| 2×6×8 pressure-treated, ground contact (floor frame) | 3 | $7.98 | $23.94 |
| 2×4×8 stud, kiln-dried (walls, rafters, ridge, fascia) | 20 | $3.50 | $70.00 |
| ¾″ exterior plywood, 4×8 (floor, roof and gable ends) | 3 | $52.00 | $156.00 |
| ½″ exterior plywood, 4×8, smooth face (wall panels) | 2 | $38.00 | $76.00 |
| 4 × 8 × 16″ solid concrete block (foundation) | 4 | $2.48 | $9.92 |
| Paver base, 0.5 cu ft bag (2″ under each block) | 2 | $5.98 | $11.96 |
| Auger ground anchor with eye, 15″ or longer (hidden under the floor) | 4 | $7.98 | $31.92 |
| ⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut (anchor eye to the floor frame) | 4 | $2.28 | $9.12 |
| #9 × 3″ exterior coated screws, 1-lb box (~75) (framing · about 180) | 3 | $10.98 | $32.94 |
| #10 × 3½″ exterior coated screws, 1-lb box (~55) (walls to the floor · about 21) | 1 | $10.98 | $10.98 |
| #9 × 2½″ exterior coated screws, 1-lb box (~95) (cap plates · about 38) | 1 | $10.98 | $10.98 |
| #8 × 2″ exterior coated screws, 1-lb box (~140) (floor and roof plywood · about 134) | 2 | $10.98 | $21.96 |
| #8 × 1⅝″ exterior coated screws, 1-lb box (~170) (wall panels and gables · about 181) | 2 | $10.98 | $21.96 |
| 3-tab asphalt shingles, bundle (33 sq ft) (28 sq ft of roof plus starter and ridge caps) | 2 | $32.98 | $65.96 |
| #15 roofing felt, roll | 1 | $27.98 | $27.98 |
| ¾″ galvanized roofing nails, 1-lb box (¾″ only: longer nails come through the ceiling) | 1 | $4.98 | $4.98 |
| Galvanized Z-flashing, 10′ (over the front and back panels, under the gables) | 1 | $9.98 | $9.98 |
| Exterior paintable caulk, tube | 1 | $7.48 | $7.48 |
| Exterior primer, 1 gal | 1 | $27.98 | $27.98 |
| Exterior acrylic paint, 1 gal | 1 | $38.98 | $38.98 |
| Total | $671.02 |
Tools: circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Sized against the CPSC playground handbooks (publications 325 and 324): the floor is 7¼″ above the lawn, well under the 20″ where preschoolers need a guard rail; every opening is either under 3½″ or over 9″, so none falls in the 3½″–9″ head-entrapment range; there is no door, shutter or glass to pinch fingers or shut a child in; no fastener points come through any surface a child can reach; treated lumber is used only under the floor. A ground-level playhouse needs no impact surfacing, but keep it off concrete and 6 ft clear of fences, trees and other play equipment. This is a play structure for children under supervision, not a rated building.
Loading community builds…
The floor frame is pressure-treated (today's ACQ or copper-azole treatment; never old CCA lumber, railroad ties or anything creosoted). Everything above the floor is ordinary kiln-dried framing lumber and plywood, kept dry by paint and the roof. Buy smooth-faced exterior plywood (BC or ACX), not grooved siding: the panels run both upright and sideways. Pick straight studs.
| Item | Qty | Each | Total |
|---|---|---|---|
| 2×6×8 pressure-treated, ground contact (floor frame) | 3 | $7.98 | $23.94 |
| 2×4×8 stud, kiln-dried (walls, rafters, ridge, fascia) | 20 | $3.50 | $70.00 |
| ¾″ exterior plywood, 4×8 (floor, roof and gable ends) | 3 | $52.00 | $156.00 |
| ½″ exterior plywood, 4×8, smooth face (wall panels) | 2 | $38.00 | $76.00 |
| 4 × 8 × 16″ solid concrete block (foundation) | 4 | $2.48 | $9.92 |
| Paver base, 0.5 cu ft bag (2″ under each block) | 2 | $5.98 | $11.96 |
| Auger ground anchor with eye, 15″ or longer (hidden under the floor) | 4 | $7.98 | $31.92 |
| ⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut (anchor eye to the floor frame) | 4 | $2.28 | $9.12 |
| #9 × 3″ exterior coated screws, 1-lb box (~75) (framing · about 180) | 3 | $10.98 | $32.94 |
| #10 × 3½″ exterior coated screws, 1-lb box (~55) (walls to the floor · about 21) | 1 | $10.98 | $10.98 |
| #9 × 2½″ exterior coated screws, 1-lb box (~95) (cap plates · about 38) | 1 | $10.98 | $10.98 |
| #8 × 2″ exterior coated screws, 1-lb box (~140) (floor and roof plywood · about 134) | 2 | $10.98 | $21.96 |
| #8 × 1⅝″ exterior coated screws, 1-lb box (~170) (wall panels and gables · about 181) | 2 | $10.98 | $21.96 |
| 3-tab asphalt shingles, bundle (33 sq ft) (28 sq ft of roof plus starter and ridge caps) | 2 | $32.98 | $65.96 |
| #15 roofing felt, roll | 1 | $27.98 | $27.98 |
| ¾″ galvanized roofing nails, 1-lb box (¾″ only: longer nails come through the ceiling) | 1 | $4.98 | $4.98 |
| Galvanized Z-flashing, 10′ (over the front and back panels, under the gables) | 1 | $9.98 | $9.98 |
| Exterior paintable caulk, tube | 1 | $7.48 | $7.48 |
| Exterior primer, 1 gal | 1 | $27.98 | $27.98 |
| Exterior acrylic paint, 1 gal | 1 | $38.98 | $38.98 |
| Total | $671.02 |
Tools: circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.
Framing first, then sheets. The frame is 48″ wide and 47″ deep, one inch shallower than nominal, so each side panel covers the edges of the front and back panels and still comes out at a full 48″.
Rafters: set the miter saw to 30° and cut both ends parallel, 31½″ along the edge. On all but four of them, lay out the birdsmouth on the bottom edge: measure 4⅝″ up from the tail cut, draw a line parallel to the end cuts ⅞″ long, then a 1½″ line square to it back out to the edge. Cut that small triangle out with a jigsaw. Make one, test it on a wall, and use it as the pattern.
| Tag | Part | Length | Qty | Cut |
|---|---|---|---|---|
| A | Floor rim, front & back (treated, on edge) | 48″ | 2 | square |
| B | Floor joist (treated, on edge, between the rims) | 44″ | 4 | square |
| C | Front top plate, back top & bottom plate | 48″ | 3 | square |
| D | Front bottom plate, one each side of the door | 12¾″ | 2 | square |
| E | Side wall plate, top & bottom | 40″ | 4 | square |
| F | Wall stud | 41½″ | 15 | square |
| G | Window sill & header (flat, between two studs) | 22½″ | 4 | square |
| H | Cap plate, sides (laps over the front and back walls) | 47″ | 2 | square |
| J | Cap plate, front & back (between the side caps) | 41″ | 2 | square |
| K | Gable stud (under each end of the ridge) | 13⅛″ | 2 | square |
| L | Ridge board (on edge) | 59″ | 1 | square |
| M | Rafter, incl. 4 fly rafters | 31½″ | 10 | 30° plumb cut both ends, parallel; length is along either edge. Birdsmouth on all but the 4 fly rafters |
| N | Fascia (on edge across the rafter tails) | 59″ | 2 | square; round the two outside edges |
| P1 | Floor, ¾″ plywood (47″ wide) | 48″ | 1 | square |
| P2 | Back wall panel, ½″ plywood (46½″ wide) | 48″ | 1 | square |
| P3 | Front wall panel, ½″ plywood (door cut out after it is on) (46½″ wide) | 48″ | 1 | square |
| P4 | Side wall panel, ½″ plywood (window cut out after it is on) (46½″ wide) | 48″ | 2 | square |
| P5 | Gable end, ¾″ plywood (17⅞″ wide) | 48″ | 2 | peak at the center, 4⅜″ tall at each end; notch 1½″ × 3½″ out of the peak for the ridge |
| P6 | Roof panel, ¾″ plywood (34⅛″ wide) | 59″ | 2 | square |
| Sheet | What comes out of it |
|---|---|
| ¾″ no. 1 | Floor 48 × 47″ |
| ¾″ no. 2, 3 | Roof panel 59″ × 34⅛″ each; a gable end from each 36⅞″ offcut |
| ½″ no. 1 | Front and back panels, 48 × 46½″ each |
| ½″ no. 2 | Two side panels, 48 × 46½″ each |
Pick level ground you can see from the house, with 6 ft clear on every side. Not on concrete or asphalt.
A small building is a sail. Anchor the frame now, while you can still reach inside it.
The floor is now 7¼″ above the lawn: one easy step up, and far below the 20″ where a preschooler's platform needs a guard rail.
Build each wall flat on the new floor, then stand it up. Two 3″ screws through the plate into each stud end.
Stand each wall flush with the edge of the floor and drive 3½″ screws down through the bottom plate every 12″, into the rim below. Plumb it and hold it with a scrap brace screwed to the floor frame.
Each side wall is 40″ long and fits between the front and back walls.
All wall panels are 46½″ tall. Hang each one with its top edge 1¼″ below the top of the cap plates; the bottom then covers the edge of the floor and laps 1″ onto the frame so rain runs off. 1⅝″ screws every 8″ into every stud and plate, heads flush.
The roof is a 30° gable: one 59″ ridge board held up by a short stud on each gable wall, with 3 pairs of rafters.
A 4 × 4 ft playhouse, 5′ 11⅜″ to the peak, with 46″ of headroom at the walls and 59⅛″ under the ridge.
Caulk the panel corners and the gable seams, prime, and give it two coats of exterior acrylic paint, floor included. Let it cure for a few days before it is played in.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Sized against the CPSC playground handbooks (publications 325 and 324): the floor is 7¼″ above the lawn, well under the 20″ where preschoolers need a guard rail; every opening is either under 3½″ or over 9″, so none falls in the 3½″–9″ head-entrapment range; there is no door, shutter or glass to pinch fingers or shut a child in; no fastener points come through any surface a child can reach; treated lumber is used only under the floor. A ground-level playhouse needs no impact surfacing, but keep it off concrete and 6 ft clear of fences, trees and other play equipment. This is a play structure for children under supervision, not a rated building.
Before you build. This plan is a free guide. It is not an engineered, code-reviewed or load-tested design. Check every measurement against your own space and materials, follow your tools' manuals, and stop and ask a licensed professional if you are unsure. You build and use it at your own risk. Full disclaimer: /disclaimer on the site.
The whole build on one page
All 11 steps for the default size (4 × 4 ft playhouse; 5′ 11⅜″ to the peak · 20 studs). The interactive manual at the top of this page rewrites every number here for the size you choose.
Step 1 of 11
The floor frame is pressure-treated (today's ACQ or copper-azole treatment; never old CCA lumber, railroad ties or anything creosoted). Everything above the floor is ordinary kiln-dried framing lumber and plywood, kept dry by paint and the roof. Buy smooth-faced exterior plywood (BC or ACX), not grooved siding: the panels run both upright and sideways. Pick straight studs.
| Item | Qty | Each | Total |
|---|---|---|---|
| 2×6×8 pressure-treated, ground contact (floor frame) | 3 | $7.98 | $23.94 |
| 2×4×8 stud, kiln-dried (walls, rafters, ridge, fascia) | 20 | $3.50 | $70.00 |
| ¾″ exterior plywood, 4×8 (floor, roof and gable ends) | 3 | $52.00 | $156.00 |
| ½″ exterior plywood, 4×8, smooth face (wall panels) | 2 | $38.00 | $76.00 |
| 4 × 8 × 16″ solid concrete block (foundation) | 4 | $2.48 | $9.92 |
| Paver base, 0.5 cu ft bag (2″ under each block) | 2 | $5.98 | $11.96 |
| Auger ground anchor with eye, 15″ or longer (hidden under the floor) | 4 | $7.98 | $31.92 |
| ⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut (anchor eye to the floor frame) | 4 | $2.28 | $9.12 |
| #9 × 3″ exterior coated screws, 1-lb box (~75) (framing · about 180) | 3 | $10.98 | $32.94 |
| #10 × 3½″ exterior coated screws, 1-lb box (~55) (walls to the floor · about 21) | 1 | $10.98 | $10.98 |
| #9 × 2½″ exterior coated screws, 1-lb box (~95) (cap plates · about 38) | 1 | $10.98 | $10.98 |
| #8 × 2″ exterior coated screws, 1-lb box (~140) (floor and roof plywood · about 134) | 2 | $10.98 | $21.96 |
| #8 × 1⅝″ exterior coated screws, 1-lb box (~170) (wall panels and gables · about 181) | 2 | $10.98 | $21.96 |
| 3-tab asphalt shingles, bundle (33 sq ft) (28 sq ft of roof plus starter and ridge caps) | 2 | $32.98 | $65.96 |
| #15 roofing felt, roll | 1 | $27.98 | $27.98 |
| ¾″ galvanized roofing nails, 1-lb box (¾″ only: longer nails come through the ceiling) | 1 | $4.98 | $4.98 |
| Galvanized Z-flashing, 10′ (over the front and back panels, under the gables) | 1 | $9.98 | $9.98 |
| Exterior paintable caulk, tube | 1 | $7.48 | $7.48 |
| Exterior primer, 1 gal | 1 | $27.98 | $27.98 |
| Exterior acrylic paint, 1 gal | 1 | $38.98 | $38.98 |
| Total | $671.02 |
Tools: circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.
Step 2 of 11
Framing first, then sheets. The frame is 48″ wide and 47″ deep, one inch shallower than nominal, so each side panel covers the edges of the front and back panels and still comes out at a full 48″.
Rafters: set the miter saw to 30° and cut both ends parallel, 31½″ along the edge. On all but four of them, lay out the birdsmouth on the bottom edge: measure 4⅝″ up from the tail cut, draw a line parallel to the end cuts ⅞″ long, then a 1½″ line square to it back out to the edge. Cut that small triangle out with a jigsaw. Make one, test it on a wall, and use it as the pattern.
| Tag | Part | Length | Qty | Cut |
|---|---|---|---|---|
| A | Floor rim, front & back (treated, on edge) | 48″ | 2 | square |
| B | Floor joist (treated, on edge, between the rims) | 44″ | 4 | square |
| C | Front top plate, back top & bottom plate | 48″ | 3 | square |
| D | Front bottom plate, one each side of the door | 12¾″ | 2 | square |
| E | Side wall plate, top & bottom | 40″ | 4 | square |
| F | Wall stud | 41½″ | 15 | square |
| G | Window sill & header (flat, between two studs) | 22½″ | 4 | square |
| H | Cap plate, sides (laps over the front and back walls) | 47″ | 2 | square |
| J | Cap plate, front & back (between the side caps) | 41″ | 2 | square |
| K | Gable stud (under each end of the ridge) | 13⅛″ | 2 | square |
| L | Ridge board (on edge) | 59″ | 1 | square |
| M | Rafter, incl. 4 fly rafters | 31½″ | 10 | 30° plumb cut both ends, parallel; length is along either edge. Birdsmouth on all but the 4 fly rafters |
| N | Fascia (on edge across the rafter tails) | 59″ | 2 | square; round the two outside edges |
| P1 | Floor, ¾″ plywood (47″ wide) | 48″ | 1 | square |
| P2 | Back wall panel, ½″ plywood (46½″ wide) | 48″ | 1 | square |
| P3 | Front wall panel, ½″ plywood (door cut out after it is on) (46½″ wide) | 48″ | 1 | square |
| P4 | Side wall panel, ½″ plywood (window cut out after it is on) (46½″ wide) | 48″ | 2 | square |
| P5 | Gable end, ¾″ plywood (17⅞″ wide) | 48″ | 2 | peak at the center, 4⅜″ tall at each end; notch 1½″ × 3½″ out of the peak for the ridge |
| P6 | Roof panel, ¾″ plywood (34⅛″ wide) | 59″ | 2 | square |
| Sheet | What comes out of it |
|---|---|
| ¾″ no. 1 | Floor 48 × 47″ |
| ¾″ no. 2, 3 | Roof panel 59″ × 34⅛″ each; a gable end from each 36⅞″ offcut |
| ½″ no. 1 | Front and back panels, 48 × 46½″ each |
| ½″ no. 2 | Two side panels, 48 × 46½″ each |
Step 3 of 11
Pick level ground you can see from the house, with 6 ft clear on every side. Not on concrete or asphalt.
Step 4 of 11
A small building is a sail. Anchor the frame now, while you can still reach inside it.
The floor is now 7¼″ above the lawn: one easy step up, and far below the 20″ where a preschooler's platform needs a guard rail.
Step 5 of 11
Build each wall flat on the new floor, then stand it up. Two 3″ screws through the plate into each stud end.
Stand each wall flush with the edge of the floor and drive 3½″ screws down through the bottom plate every 12″, into the rim below. Plumb it and hold it with a scrap brace screwed to the floor frame.
Step 6 of 11
Each side wall is 40″ long and fits between the front and back walls.
Step 7 of 11
All wall panels are 46½″ tall. Hang each one with its top edge 1¼″ below the top of the cap plates; the bottom then covers the edge of the floor and laps 1″ onto the frame so rain runs off. 1⅝″ screws every 8″ into every stud and plate, heads flush.
Step 8 of 11
The roof is a 30° gable: one 59″ ridge board held up by a short stud on each gable wall, with 3 pairs of rafters.
Step 9 of 11
Step 10 of 11
Step 11 of 11
A 4 × 4 ft playhouse, 5′ 11⅜″ to the peak, with 46″ of headroom at the walls and 59⅛″ under the ridge.
Caulk the panel corners and the gable seams, prime, and give it two coats of exterior acrylic paint, floor included. Let it cure for a few days before it is played in.
Questions
Answers come straight from this plan's own numbers at its default size.
At the default size (4 × 4 ft playhouse), the shopping list comes to $671.02. That uses the site's default prices (lumber at Home Depot prices in Dallas–Fort Worth, November 2026) and typical prices for hardware and other materials. Enter what your store charges and the total updates for your size and your prices.
Plan on 2 weekends at the default size. It is rated advanced, and the manual has 9 build steps after the shopping list and cut list.
Yes. You can set Floor size: 4 × 4 ft · one or two kids, 4 × 6 ft · 4 ft front, 6 ft deep, 6 × 6 ft · room for a table. Change any of them and the 3D model, shopping list, cut list and step-by-step instructions are recalculated to match.
For the default size (4 × 4 ft playhouse): 3 × 2×6×8 pressure-treated, ground contact; 20 × 2×4×8 stud, kiln-dried; 3 × ¾″ exterior plywood, 4×8; 2 × ½″ exterior plywood, 4×8, smooth face; 4 × 4 × 8 × 16″ solid concrete block; 2 × Paver base, 0.5 cu ft bag; 4 × Auger ground anchor with eye, 15″ or longer; 4 × ⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut; 3 × #9 × 3″ exterior coated screws, 1-lb box (~75); 1 × #10 × 3½″ exterior coated screws, 1-lb box (~55); 1 × #9 × 2½″ exterior coated screws, 1-lb box (~95); 2 × #8 × 2″ exterior coated screws, 1-lb box (~140); 2 × #8 × 1⅝″ exterior coated screws, 1-lb box (~170); 2 × 3-tab asphalt shingles, bundle (33 sq ft); 1 × #15 roofing felt, roll; 1 × ¾″ galvanized roofing nails, 1-lb box; 1 × Galvanized Z-flashing, 10′; 1 × Exterior paintable caulk, tube; 1 × Exterior primer, 1 gal; 1 × Exterior acrylic paint, 1 gal. The list changes with the size you choose.
Circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.
Yes, and both are free. The PDF button builds a manual for the size you chose, with a 3D picture for each step, the shopping list, the cut list and a cut diagram showing which pieces come out of which board. No account is needed.
Yes. On a phone or tablet, tap View in room on this page and the finished playhouse appears in your space at real size, in whatever size you have set, using your camera (augmented reality, or AR). On a computer the same button shows a QR code to scan with your phone. The preview is approximate: placement can drift by an inch or more, so use it to get a feel for the fit, not to measure or to check that anything is safe.
No, it is not engineered. Like every plan on the site, this is a free guide that has not been designed or reviewed by an engineer, checked against a building code, or load-tested. You may well need a permit: a structure like this is often covered by local building code, zoning, setback and HOA rules, and those differ from place to place. Ask your building department before you buy materials. It is also not tested or certified to any children's product safety standard, so an adult needs to build it carefully, inspect it regularly and supervise its use. You build and use it at your own risk.
Keep building
A twin-over-twin bunk bed with through-bolted rails, guard rails on all four sides of the top bunk, a built-in ladder and a wall anchor.
A Montessori-style floor bed in a house-shaped 2×4 frame: twin or full mattress on a low slatted platform, glued gable ends, optional low rails.
A one-sheet plywood toy chest with a lid that stays open wherever you leave it, a finger gap at the front, air vents and no latch.
A kitchen helper tower that brings a toddler up to a 36″ counter: a platform that bolts in at 18, 15 or 12″, a step, and closed guards on all four sides.
New to building? Start with how to read a cut list and actual lumber sizes.