Skip to content

Plan 61 · free 3D guide, cut list and PDF

Playhouse Plans

Build a backyard playhouse with stud walls, an open doorway and windows and a shingled gable roof, anchored to the ground and sized for kids 2 to 8. Set your size below and the 3D model, shopping list, cut list and every step update to match.

Level
Advanced
Time
2 weekends
Materials
About $671
Showing4 × 4 ft playhouse5′ 11⅜″ to the peak · 20 studs · $671.02
Loading model…
1
This stepDone
1
Step 1 of 11

Shopping list

The floor frame is pressure-treated (today's ACQ or copper-azole treatment; never old CCA lumber, railroad ties or anything creosoted). Everything above the floor is ordinary kiln-dried framing lumber and plywood, kept dry by paint and the roof. Buy smooth-faced exterior plywood (BC or ACX), not grooved siding: the panels run both upright and sideways. Pick straight studs.

ItemQtyEachTotal
2×6×8 pressure-treated, ground contact (floor frame)3$7.98$23.94
2×4×8 stud, kiln-dried (walls, rafters, ridge, fascia)20$3.50$70.00
¾″ exterior plywood, 4×8 (floor, roof and gable ends)3$52.00$156.00
½″ exterior plywood, 4×8, smooth face (wall panels)2$38.00$76.00
4 × 8 × 16″ solid concrete block (foundation)4$2.48$9.92
Paver base, 0.5 cu ft bag (2″ under each block)2$5.98$11.96
Auger ground anchor with eye, 15″ or longer (hidden under the floor)4$7.98$31.92
⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut (anchor eye to the floor frame)4$2.28$9.12
#9 × 3″ exterior coated screws, 1-lb box (~75) (framing · about 180)3$10.98$32.94
#10 × 3½″ exterior coated screws, 1-lb box (~55) (walls to the floor · about 21)1$10.98$10.98
#9 × 2½″ exterior coated screws, 1-lb box (~95) (cap plates · about 38)1$10.98$10.98
#8 × 2″ exterior coated screws, 1-lb box (~140) (floor and roof plywood · about 134)2$10.98$21.96
#8 × 1⅝″ exterior coated screws, 1-lb box (~170) (wall panels and gables · about 181)2$10.98$21.96
3-tab asphalt shingles, bundle (33 sq ft) (28 sq ft of roof plus starter and ridge caps)2$32.98$65.96
#15 roofing felt, roll1$27.98$27.98
¾″ galvanized roofing nails, 1-lb box (¾″ only: longer nails come through the ceiling)1$4.98$4.98
Galvanized Z-flashing, 10′ (over the front and back panels, under the gables)1$9.98$9.98
Exterior paintable caulk, tube1$7.48$7.48
Exterior primer, 1 gal1$27.98$27.98
Exterior acrylic paint, 1 gal1$38.98$38.98
Total$671.02

Tools: circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.

Every fastener that touches the treated floor frame must be hot-dip galvanized, stainless or coated and labeled for treated lumber. Plain zinc screws corrode in it.

Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.

2×6 × 8′

3 boards95% yield
×23⅞″
×17⅞″

2×4 × 8′

20 boards91% yield
×15⅜″
×25⅜″
×2⅞″
×16⅜″
×20″
×512⅞″
×1⅝″
×12⅝″
×115⅞″
×21¼″
×119¼″
×150⅞″

Sheet goods

  • P1 Floor, ¾″ plywood: 1 × 48″ × 47″
  • P2 Back wall panel, ½″ plywood: 1 × 48″ × 46½″
  • P3 Front wall panel, ½″ plywood (door cut out after it is on): 1 × 48″ × 46½″
  • P4 Side wall panel, ½″ plywood (window cut out after it is on): 2 × 48″ × 46½″
  • P5 Gable end, ¾″ plywood: 2 × 48″ × 17⅞″
  • P6 Roof panel, ¾″ plywood: 2 × 59″ × 34⅛″

Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.

Sized against the CPSC playground handbooks (publications 325 and 324): the floor is 7¼″ above the lawn, well under the 20″ where preschoolers need a guard rail; every opening is either under 3½″ or over 9″, so none falls in the 3½″–9″ head-entrapment range; there is no door, shutter or glass to pinch fingers or shut a child in; no fastener points come through any surface a child can reach; treated lumber is used only under the floor. A ground-level playhouse needs no impact surfacing, but keep it off concrete and 6 ft clear of fences, trees and other play equipment. This is a play structure for children under supervision, not a rated building.

Community builds

Loading community builds…

The whole build on one page

How to build a playhouse

All 11 steps for the default size (4 × 4 ft playhouse; 5′ 11⅜″ to the peak · 20 studs). The interactive manual at the top of this page rewrites every number here for the size you choose.

  1. Step 1 of 11

    Shopping list

    The floor frame is pressure-treated (today's ACQ or copper-azole treatment; never old CCA lumber, railroad ties or anything creosoted). Everything above the floor is ordinary kiln-dried framing lumber and plywood, kept dry by paint and the roof. Buy smooth-faced exterior plywood (BC or ACX), not grooved siding: the panels run both upright and sideways. Pick straight studs.

    ItemQtyEachTotal
    2×6×8 pressure-treated, ground contact (floor frame)3$7.98$23.94
    2×4×8 stud, kiln-dried (walls, rafters, ridge, fascia)20$3.50$70.00
    ¾″ exterior plywood, 4×8 (floor, roof and gable ends)3$52.00$156.00
    ½″ exterior plywood, 4×8, smooth face (wall panels)2$38.00$76.00
    4 × 8 × 16″ solid concrete block (foundation)4$2.48$9.92
    Paver base, 0.5 cu ft bag (2″ under each block)2$5.98$11.96
    Auger ground anchor with eye, 15″ or longer (hidden under the floor)4$7.98$31.92
    ⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut (anchor eye to the floor frame)4$2.28$9.12
    #9 × 3″ exterior coated screws, 1-lb box (~75) (framing · about 180)3$10.98$32.94
    #10 × 3½″ exterior coated screws, 1-lb box (~55) (walls to the floor · about 21)1$10.98$10.98
    #9 × 2½″ exterior coated screws, 1-lb box (~95) (cap plates · about 38)1$10.98$10.98
    #8 × 2″ exterior coated screws, 1-lb box (~140) (floor and roof plywood · about 134)2$10.98$21.96
    #8 × 1⅝″ exterior coated screws, 1-lb box (~170) (wall panels and gables · about 181)2$10.98$21.96
    3-tab asphalt shingles, bundle (33 sq ft) (28 sq ft of roof plus starter and ridge caps)2$32.98$65.96
    #15 roofing felt, roll1$27.98$27.98
    ¾″ galvanized roofing nails, 1-lb box (¾″ only: longer nails come through the ceiling)1$4.98$4.98
    Galvanized Z-flashing, 10′ (over the front and back panels, under the gables)1$9.98$9.98
    Exterior paintable caulk, tube1$7.48$7.48
    Exterior primer, 1 gal1$27.98$27.98
    Exterior acrylic paint, 1 gal1$38.98$38.98
    Total$671.02

    Tools: circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.

    Every fastener that touches the treated floor frame must be hot-dip galvanized, stainless or coated and labeled for treated lumber. Plain zinc screws corrode in it.
  2. Step 2 of 11

    Cut list

    Framing first, then sheets. The frame is 48″ wide and 47″ deep, one inch shallower than nominal, so each side panel covers the edges of the front and back panels and still comes out at a full 48″.

    Rafters: set the miter saw to 30° and cut both ends parallel, 31½″ along the edge. On all but four of them, lay out the birdsmouth on the bottom edge: measure 4⅝″ up from the tail cut, draw a line parallel to the end cuts ⅞″ long, then a 1½″ line square to it back out to the edge. Cut that small triangle out with a jigsaw. Make one, test it on a wall, and use it as the pattern.

    TagPartLengthQtyCut
    AFloor rim, front & back (treated, on edge)48″2square
    BFloor joist (treated, on edge, between the rims)44″4square
    CFront top plate, back top & bottom plate48″3square
    DFront bottom plate, one each side of the door12¾″2square
    ESide wall plate, top & bottom40″4square
    FWall stud41½″15square
    GWindow sill & header (flat, between two studs)22½″4square
    HCap plate, sides (laps over the front and back walls)47″2square
    JCap plate, front & back (between the side caps)41″2square
    KGable stud (under each end of the ridge)13⅛″2square
    LRidge board (on edge)59″1square
    MRafter, incl. 4 fly rafters31½″1030° plumb cut both ends, parallel; length is along either edge. Birdsmouth on all but the 4 fly rafters
    NFascia (on edge across the rafter tails)59″2square; round the two outside edges
    P1Floor, ¾″ plywood (47″ wide)48″1square
    P2Back wall panel, ½″ plywood (46½″ wide)48″1square
    P3Front wall panel, ½″ plywood (door cut out after it is on) (46½″ wide)48″1square
    P4Side wall panel, ½″ plywood (window cut out after it is on) (46½″ wide)48″2square
    P5Gable end, ¾″ plywood (17⅞″ wide)48″2peak at the center, 4⅜″ tall at each end; notch 1½″ × 3½″ out of the peak for the ridge
    P6Roof panel, ¾″ plywood (34⅛″ wide)59″2square
    SheetWhat comes out of it
    ¾″ no. 1Floor 48 × 47″
    ¾″ no. 2, 3Roof panel 59″ × 34⅛″ each; a gable end from each 36⅞″ offcut
    ½″ no. 1Front and back panels, 48 × 46½″ each
    ½″ no. 2Two side panels, 48 × 46½″ each
    Before anything goes together: ease every edge a child can touch with a ¼″ roundover bit or 80-grit paper, sand out splinters, and prime the cut edges of the plywood. Wear a dust mask and cut the treated 2×6s outdoors.
  3. Step 3 of 11

    Blocks and floor frame

    Pick level ground you can see from the house, with 6 ft clear on every side. Not on concrete or asphalt.

    1. Mark a 48″ × 47″ rectangle. Set a solid block under each corner: cut out the sod, tamp in 2″ of paver base, and bed the block so its top is about 1″ above the lawn. Level every block to the others with a straight 2×6 and a level.
    2. Screw the frame together on the lawn: the two 48″ rims with the 4 joists (44″) between them, joist faces 0″, 15¼″, 31¼″, 46½″ from the left end of the rim. That puts the inner joists 16″ on center. Three 3″ screws through the rim into each joist end.
    3. Lift the frame onto the blocks, outer corners flush with the block corners. Measure both diagonals and rack it until they match.
    The 2×6s are treated and the screws must be rated for treated lumber. Nothing else in the build touches the ground.
  4. Step 4 of 11

    Anchor it and lay the floor

    A small building is a sail. Anchor the frame now, while you can still reach inside it.

    1. Twist four auger anchors into the ground inside the frame, tight against the inside face of the two end joists, about 9″ in from each rim (just past the corner blocks). Stop when the eye is level with the middle of the joist.
    2. Drill ⅜″ through the joist at each eye. Carriage bolt from the outside, fender washer and lock nut on the inside. The round bolt heads end up just below the wall panels.
    3. Lay the 48″ × 47″ floor flush with the frame all round. 2″ screws every 8″ into every joist and rim, heads flush.

    The floor is now 7¼″ above the lawn: one easy step up, and far below the 20″ where a preschooler's platform needs a guard rail.

    The anchors are under the floor on purpose. An exposed stake or anchor next to a playhouse is a trip hazard.
  5. Step 5 of 11

    Front and back walls

    Build each wall flat on the new floor, then stand it up. Two 3″ screws through the plate into each stud end.

    • Back wall: 48″ top and bottom plates, 3 studs (41½″) with their left faces at 0″, 23¼″, 46½″.
    • Front wall: one 48″ top plate, a 12¾″ bottom plate at each end, and four studs with their left faces at 0″, 11¼″, 35¼″, 46½″. The gap in the middle is the 22½″ doorway; tack a scrap across the bottom of it to hold the wall square until it is screwed down.

    Stand each wall flush with the edge of the floor and drive 3½″ screws down through the bottom plate every 12″, into the rim below. Plumb it and hold it with a scrap brace screwed to the floor frame.

    The doorway is 22½″ wide and 43″ high with no door in it. Nothing swings, so nothing pinches fingers, and nobody can be shut in.
  6. Step 6 of 11

    Side walls and cap plates

    Each side wall is 40″ long and fits between the front and back walls.

    1. Make the window first, while you can reach it: two studs with a 22½″ sill and header between them, the top of the sill 18½″ and the underside of the header 34½″ from the stud bottoms. Two 3″ screws through the stud into each end.
    2. Screw the top and bottom plates onto that pair and the two end studs: stud faces 0″, 7¼″, 31¼″, 38½″ from the back end of the plate.
    3. Stand the wall between the other two, flush with the floor edge, and screw the bottom plate down with 3½″ screws every 12″.
    4. Tie each corner: three 3″ screws driven at an angle from inside the first stud bay of the front (or back) wall, through its end stud into the end stud of the side wall.
    5. Cap plates: one 47″ cap on each side wall, running over the ends of the front and back walls, then one 41″ cap between them at the front and at the back. 2½″ screws every 12″, staggered, and two into each lapped corner. The caps lock the four walls together.
    Each window is 22½″ × 16″, open, with its sill 20″ above the floor. Both ways it is far over the 9″ limit, so a head that goes in comes back out.
  7. Step 7 of 11

    Wall panels

    All wall panels are 46½″ tall. Hang each one with its top edge 1¼″ below the top of the cap plates; the bottom then covers the edge of the floor and laps 1″ onto the frame so rain runs off. 1⅝″ screws every 8″ into every stud and plate, heads flush.

    1. Back panel first, then the front panel right across the doorway.
    2. Then the two side panels. They run past the corners and cover the edges of the front and back panels.
    3. Cut the doorway out: from inside, drill a hole at each top corner, then jigsaw along the studs and the top plate.
    4. Cut the two windows out the same way, following the studs, sill and header.
    5. Round over and sand every cut edge, then prime it.
    Run your hand over every edge and both faces of each panel. Any splinter you find, a child will find faster.
  8. Step 8 of 11

    Ridge and rafters

    The roof is a 30° gable: one 59″ ridge board held up by a short stud on each gable wall, with 3 pairs of rafters.

    1. Stand one 13⅛″ gable stud on the exact middle of the front cap plate and another on the back, turned so its 1½″ edge faces out and the stud covers the full width of the plate. Two 3″ screws at an angle into the cap from each side.
    2. Set the ridge on edge on top of the two studs, sticking out 6″ past each wall, and screw it down at an angle into each stud.
    3. Mark the rafter positions on both cap plates and the ridge: the first flush with the outside of the back wall, then every 22¾″, the last flush with the front.
    4. Set each rafter with its birdsmouth on the outer edge of the cap plate and its top cut against the ridge, top edges flush. Two 3″ screws through the ridge into the first rafter of a pair, two at an angle through the second into the ridge, and one 3″ screw at an angle from each side down into the cap plate.
    Check the slot above each side wall, between cap plate and rafter top: it should be about 3⅛″. Under 3½″ nothing but a hand fits through. If yours measures more, close it with a strip of plywood.
  9. Step 9 of 11

    Gable ends, fly rafters and fascia

    1. Slip Z-flashing over the top edge of the front and back wall panels.
    2. Gable ends: on a 48″ × 17⅞″ piece, mark the center of the top edge and 4⅜″ up each end, join the marks and cut. Notch the peak 1½″ × 3½″ for the ridge. Screw each one to the end rafters, the gable stud and the cap plate with 2″ screws every 8″.
    3. Fly rafters: the four rafters without a birdsmouth go at the very ends of the ridge, two 3″ screws through the ridge into the first and two at an angle through the second.
    4. Fascia: one 59″ 2×4 on edge across the rafter tails on each side, its top corner just under the line of the rafter tops. Two 3″ screws into the end of every rafter, fly rafters included.
    The fascia's lower edge is 49¾″ above the lawn, about eye height for a six-year-old running past. Round both outside edges and the four ends generously, and do not add metal drip edge.
  10. Step 10 of 11

    Roof panels and shingles

    1. Lay one 59″ × 34⅛″ panel on each slope, top edge at the centerline of the ridge, ends flush with the fly rafters. 2″ screws every 8″ into every rafter and the fascia.
    2. Round the four lower corners of the roof to a 1″ radius with a jigsaw and sand them.
    3. Staple or nail roofing felt over both slopes, lapped over the ridge.
    4. Shingle from the eaves up, following the wrapper: an upside-down starter course, 5″ exposure, four nails per shingle, each course offset half a tab. Let the first course hang ½″ over the fascia. Cap the ridge with single tabs.
    Use ¾″ roofing nails only. The roof is ¾″ plywood so that they stop inside it; a standard 1¼″ nail would leave a row of points across the ceiling at head height. When you are done, go inside with a flashlight and check.
  11. Step 11 of 11

    Done

    A 4 × 4 ft playhouse, 5′ 11⅜″ to the peak, with 46″ of headroom at the walls and 59⅛″ under the ridge.

    Caulk the panel corners and the gable seams, prime, and give it two coats of exterior acrylic paint, floor included. Let it cure for a few days before it is played in.

    • Before the first kid goes in: every screw head flush, no splinters, no sharp corner anywhere, nothing poking through the ceiling.
    • Never tie a rope, a jump rope or a dog leash to it, and do not hang anything a child could loop around their neck.
    • Each spring: check the anchor bolts, look for wasp nests under the eaves, and repaint before the paint starts to peel.
    No climbing on the roof. If older kids start using the window sills as a ladder, it is time for a different build.

Questions

Playhouse plan FAQ

Answers come straight from this plan's own numbers at its default size.

How much does it cost to build a playhouse?

At the default size (4 × 4 ft playhouse), the shopping list comes to $671.02. That uses the site's default prices (lumber at Home Depot prices in Dallas–Fort Worth, November 2026) and typical prices for hardware and other materials. Enter what your store charges and the total updates for your size and your prices.

How long does it take to build a playhouse?

Plan on 2 weekends at the default size. It is rated advanced, and the manual has 9 build steps after the shopping list and cut list.

Can I change the size of this playhouse plan?

Yes. You can set Floor size: 4 × 4 ft · one or two kids, 4 × 6 ft · 4 ft front, 6 ft deep, 6 × 6 ft · room for a table. Change any of them and the 3D model, shopping list, cut list and step-by-step instructions are recalculated to match.

What materials do I need?

For the default size (4 × 4 ft playhouse): 3 × 2×6×8 pressure-treated, ground contact; 20 × 2×4×8 stud, kiln-dried; 3 × ¾″ exterior plywood, 4×8; 2 × ½″ exterior plywood, 4×8, smooth face; 4 × 4 × 8 × 16″ solid concrete block; 2 × Paver base, 0.5 cu ft bag; 4 × Auger ground anchor with eye, 15″ or longer; 4 × ⅜″ × 3″ galvanized carriage bolt, fender washer & lock nut; 3 × #9 × 3″ exterior coated screws, 1-lb box (~75); 1 × #10 × 3½″ exterior coated screws, 1-lb box (~55); 1 × #9 × 2½″ exterior coated screws, 1-lb box (~95); 2 × #8 × 2″ exterior coated screws, 1-lb box (~140); 2 × #8 × 1⅝″ exterior coated screws, 1-lb box (~170); 2 × 3-tab asphalt shingles, bundle (33 sq ft); 1 × #15 roofing felt, roll; 1 × ¾″ galvanized roofing nails, 1-lb box; 1 × Galvanized Z-flashing, 10′; 1 × Exterior paintable caulk, tube; 1 × Exterior primer, 1 gal; 1 × Exterior acrylic paint, 1 gal. The list changes with the size you choose.

What tools do I need?

Circular saw with a straightedge (or a track saw) for the plywood, miter saw, jigsaw, drill/driver, ⅜″ bit, 4′ level, speed square, tape, chalk line, hammer, utility knife, sander or a ¼″ roundover bit, shovel and hand tamper. A helper for standing the walls and setting the ridge.

Is there a printable PDF and cut list?

Yes, and both are free. The PDF button builds a manual for the size you chose, with a 3D picture for each step, the shopping list, the cut list and a cut diagram showing which pieces come out of which board. No account is needed.

Can I see it in my room before I build it?

Yes. On a phone or tablet, tap View in room on this page and the finished playhouse appears in your space at real size, in whatever size you have set, using your camera (augmented reality, or AR). On a computer the same button shows a QR code to scan with your phone. The preview is approximate: placement can drift by an inch or more, so use it to get a feel for the fit, not to measure or to check that anything is safe.

Is this playhouse plan engineered, and do I need a permit?

No, it is not engineered. Like every plan on the site, this is a free guide that has not been designed or reviewed by an engineer, checked against a building code, or load-tested. You may well need a permit: a structure like this is often covered by local building code, zoning, setback and HOA rules, and those differ from place to place. Ask your building department before you buy materials. It is also not tested or certified to any children's product safety standard, so an adult needs to build it carefully, inspect it regularly and supervise its use. You build and use it at your own risk.

Keep building

All kids & play plans
  • Bunk Bed: 3D model of the finished build

    Bunk Bed plans

    A twin-over-twin bunk bed with through-bolted rails, guard rails on all four sides of the top bunk, a built-in ladder and a wall anchor.

    Level
    Advanced
    Build time
    2 days
    Materials at the default size
    ~$392
  • House Bed: 3D model of the finished build

    House Bed plans

    A Montessori-style floor bed in a house-shaped 2×4 frame: twin or full mattress on a low slatted platform, glued gable ends, optional low rails.

    Level
    Intermediate
    Build time
    1 day
    Materials at the default size
    ~$135
  • Toy Box: 3D model of the finished build

    Toy Box plans

    A one-sheet plywood toy chest with a lid that stays open wherever you leave it, a finger gap at the front, air vents and no latch.

    Level
    Intermediate
    Build time
    1 day
    Materials at the default size
    ~$169
  • Learning Tower: 3D model of the finished build

    Learning Tower plans

    A kitchen helper tower that brings a toddler up to a 36″ counter: a platform that bolts in at 18, 15 or 12″, a step, and closed guards on all four sides.

    Level
    Intermediate
    Build time
    1 day
    Materials at the default size
    ~$116

New to building? Start with how to read a cut list and actual lumber sizes.