Trellis Arbor Builder
Shopping list
Everything here is pressure-treated and rated for ground contact where it's buried. The 4×4 posts are 108″ long, so you're buying 10′ stock for them.
| Item | Qty | Each | Total |
|---|---|---|---|
| 4×4×10 pressure-treated, ground contact | 4 | $16.47 | $65.88 |
| 2×4×8 pressure-treated (top slats) | 4 | $4.98 | $19.92 |
| 2×6×8 pressure-treated (beams) | 4 | $7.98 | $31.92 |
| 2×2×8 pressure-treated baluster stock (lattice) | 7 | $4.48 | $31.36 |
| Fast-setting post concrete, 50 lb (3 per post) | 12 | $6.25 | $75.00 |
| Gravel, 0.5 cu ft bag (drainage under each post) | 2 | $5.48 | $10.96 |
| ½″ × 8″ galvanized carriage bolt, washer, nut (beams through posts) | 8 | $3.25 | $26.00 |
| Exterior screws, 3″, 1-lb box (slats, ~60 per box) | 2 | $11.00 | $22.00 |
| Exterior screws, 2½″, 1-lb box (lattice) | 1 | $10.00 | $10.00 |
| Total | $293.04 |
Tools: post-hole digger, 4′ level and a post level, string line, circular saw, jigsaw (for the beam ends), drill/driver, ½″ × 10″ spade or auger bit, socket wrench, clamps, wheelbarrow.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
4×4 × 10′
4 boards90% yield2×6 × 8′
4 boards82% yield2×4 × 8′
4 boards96% yield2×2 × 8′
7 boards93% yieldPosts go 24″ into the ground in concrete, which is why they're longer than the arbor is tall. Beams are doubled, one on each face of the posts, and through-bolted. Prices are per board at the price you enter.
- 1
Shopping list
Everything here is pressure-treated and rated for ground contact where it's buried. The 4×4 posts are 108″ long, so you're buying 10′ stock for them.
Item Qty Each Total 4×4×10 pressure-treated, ground contact 4 $16.47 $65.88 2×4×8 pressure-treated (top slats) 4 $4.98 $19.92 2×6×8 pressure-treated (beams) 4 $7.98 $31.92 2×2×8 pressure-treated baluster stock (lattice) 7 $4.48 $31.36 Fast-setting post concrete, 50 lb (3 per post) 12 $6.25 $75.00 Gravel, 0.5 cu ft bag (drainage under each post) 2 $5.48 $10.96 ½″ × 8″ galvanized carriage bolt, washer, nut (beams through posts) 8 $3.25 $26.00 Exterior screws, 3″, 1-lb box (slats, ~60 per box) 2 $11.00 $22.00 Exterior screws, 2½″, 1-lb box (lattice) 1 $10.00 $10.00 Total $293.04 Tools: post-hole digger, 4′ level and a post level, string line, circular saw, jigsaw (for the beam ends), drill/driver, ½″ × 10″ spade or auger bit, socket wrench, clamps, wheelbarrow.
- 2
Cut list
Posts get cut after they're set: stand the full 10′ boards in the holes and trim them to 7′ above grade (108″ overall) once the concrete cures. The beam ends are the only fancy cut: draw the profile on one, cut it with a jigsaw, then trace it onto the other three.
Tag Part Length Qty Cut P Post, 4×4 108″ 4 final length; set full 10′ posts and trim the tops after the concrete cures B Top beam, 2×6 (pairs sandwich the posts) 79″ 4 decorative profile both ends S Top slat, 2×4 on edge 46″ 8 30° clip on the bottom corners H Lattice rail, 2×2 (post to post) 23″ 10 square V Lattice upright, 2×2 66″ 6 45° point on top Simple beam-end profile: from the bottom corner, mark 3″ up and 4″ in, then connect the marks with a curve traced from a paint can. Sand the cut smooth. - 3
Set the posts
Lay out a rectangle 55″ across the path by 30″ along it (outside of posts). Check square: the diagonals should both be 62⅝″.
- Dig four 10″ holes 28″ deep and pour 4″ of gravel in each.
- Stand the 4×4s on the gravel.
- Brace each post plumb on two faces with stakes and scrap 2×4s, then fill with dry concrete mix and add water per the bag.
- Let it cure overnight, then mark the lowest-standing post 7′ above grade, carry that mark level to the other three with a string line and level, and trim all four.
Call 811 before you dig. Where the ground freezes deeper than 24″, dig to below the frost line and buy longer posts to match. - 4
Beams
Clamp a beam to the outside face of the front posts, top flush with the post tops and 12″ hanging past each post. Its twin goes on the inside face. Repeat on the back pair.
- Level each beam, then drill ½″ through beam–post–beam and set two ½″ × 8″ carriage bolts at each post, one high and one low, offset diagonally and at least 1½″ in from every edge (8 total). Heads on the outside, washers and nuts on the inside.
- Shaped ends face out and down.
- 5
Top slats
8 slats on edge across the four beams, about 10″ on center, hanging 6½″ past the outside beams front and back.
- Clip the bottom corners at 30° before installing so they match the beam ends.
- Toe-screw each slat to each beam with a 3″ screw from both sides.
- 6
Lattice rails
On each side, run 5 2×2 rails between the front and back post, centered on the posts' width. The bottom of the lowest rail is 12″ off the ground and the rest step up every 14⅝″ (bottom to bottom), ending about 6½″ under the beams.
Pre-drill and toe-screw each end into the post with 2½″ screws. A spacer block cut to the rail spacing keeps them even.
- 7
Lattice uprights
3 2×2 uprights on the outside face of the rails on each side, evenly spaced between the posts, bottoms 9″ off the ground and tops 3″ above the top rail, with the 45° point up.
- One 2½″ screw at every crossing, pre-drilled so the 2×2 doesn't split.
- Plant climbers on the outside of the lattice; they'll grow in and up.
- 8
Done
A 7′ arbor with a 48″ clear path. Let PT lumber dry a couple of months before staining.
Good climbers: clematis, climbing roses, star jasmine, or a hops vine for fast summer shade. Tie young shoots to the lattice with soft garden tape.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
4×4 × 10′
4 boards90% yield2×6 × 8′
4 boards82% yield2×4 × 8′
4 boards96% yield2×2 × 8′
7 boards93% yieldPosts go 24″ into the ground in concrete, which is why they're longer than the arbor is tall. Beams are doubled, one on each face of the posts, and through-bolted. Prices are per board at the price you enter.