Sight down every 2×4 and leave the bowed and twisted ones at the store: the four uprights and the long rails want to be the straightest of the lot. Common 1×4 boards are fine for the slats; pick ones without loose knots near the ends, where the screws go.
| Item | Qty | Each | Total |
|---|---|---|---|
| 2×4×8′ SPF stud | 7 | $3.50 | $24.50 |
| 1×4×8′ common board (deck, back and end slats) | 10 | $4.50 | $45.00 |
| 2×6×8′ SPF (bat rail; the rest is offcut) | 1 | $6.98 | $6.98 |
| #9 × 3″ construction screws, 1-lb box (rungs, skids · about 42) | 1 | $10.00 | $10.00 |
| #9 × 2½″ construction screws, 1-lb box (rails, bat rail · about 29) | 1 | $10.00 | $10.00 |
| #8 × 1⅝″ wood screws, 1-lb box (all the 1×4 slats · about 128) | 1 | $9.00 | $9.00 |
| Wood glue, 16 oz (every rail-to-upright lap) | 1 | $7.00 | $7.00 |
| Zinc screw eye, about 2″ long with a ⅜″ eye (the eye has to pass ¼″ cord) | 16 | $0.60 | $9.60 |
| ¼″ shock (bungee) cord, 25′ hank (about 19′ used) | 1 | $9.00 | $9.00 |
| 3″ plate caster, locking swivel | 2 | $13.00 | $26.00 |
| 3″ plate caster, rigid | 2 | $9.00 | $18.00 |
| ¼″ × 1¼″ lag screws + washers (casters) | 16 | $0.40 | $6.40 |
| Total | $181.48 |
Tools: miter saw or circular saw with a speed square, jigsaw (bat slots), drill/driver with a T25 bit, ⅛″ and 1¼″ drill bits, tape, combination square, clamps, sandpaper.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×6 × 8′
1 board24% yield2×4 × 8′
7 boards90% yield1×4 × 8′
10 boards91% yieldWidth is over the end slats; each bat rail hangs another 3¼″ past its end and sits 1½″ above the frame. Bungee spacing is set for size-3 soccer balls and up: baseballs and tennis balls go in a bucket on the shelf. It is a ball rack, not a climbing frame: lock the casters and keep kids off it.
- 1
Shopping list
Sight down every 2×4 and leave the bowed and twisted ones at the store: the four uprights and the long rails want to be the straightest of the lot. Common 1×4 boards are fine for the slats; pick ones without loose knots near the ends, where the screws go.
Item Qty Each Total 2×4×8′ SPF stud 7 $3.50 $24.50 1×4×8′ common board (deck, back and end slats) 10 $4.50 $45.00 2×6×8′ SPF (bat rail; the rest is offcut) 1 $6.98 $6.98 #9 × 3″ construction screws, 1-lb box (rungs, skids · about 42) 1 $10.00 $10.00 #9 × 2½″ construction screws, 1-lb box (rails, bat rail · about 29) 1 $10.00 $10.00 #8 × 1⅝″ wood screws, 1-lb box (all the 1×4 slats · about 128) 1 $9.00 $9.00 Wood glue, 16 oz (every rail-to-upright lap) 1 $7.00 $7.00 Zinc screw eye, about 2″ long with a ⅜″ eye (the eye has to pass ¼″ cord) 16 $0.60 $9.60 ¼″ shock (bungee) cord, 25′ hank (about 19′ used) 1 $9.00 $9.00 3″ plate caster, locking swivel 2 $13.00 $26.00 3″ plate caster, rigid 2 $9.00 $18.00 ¼″ × 1¼″ lag screws + washers (casters) 16 $0.40 $6.40 Total $181.48 Tools: miter saw or circular saw with a speed square, jigsaw (bat slots), drill/driver with a T25 bit, ⅛″ and 1¼″ drill bits, tape, combination square, clamps, sandpaper.
- 2
Cut list
Label the piles with painter's tape. Everything front-to-back is 23½″ or 17½″, so clamp a stop block for each and cut them all at once: four 23½″ pieces come out of every 8′ board.
Tag Part Length Qty Cut U Upright 42½″ 4 square L Long rail, front/back 46½″ 6 square R Rung (ladder, front to back) 17½″ 6 square K Caster skid 23½″ 2 square B Bat rail 23½″ 1 square, then 5 slots 1¼″ wide × 2½″ deep in one edge D Deck slat 23½″ 18 square E Deck end slat (between the uprights) 17½″ 4 square X End slat 23½″ 8 square S Back slat 46½″ 4 square Mark the rung positions on all four uprights at once, measuring from the bottom end. The top of each rung sits at: 3½″, 21¾″, 42½″ (the last one is flush with the top).Bat-rail slots: on one long edge of each 2×6 piece, mark slot centers at 2¾″, 7¼″, 11¾″, 16¼″, 20¾″ from one end. Drill a 1¼″ hole centered 1⅞″ in from the edge at each mark, then saw in from the edge to both sides of the hole. Round over the slot edges with sandpaper.
- 3
Build the two ladders
Each end of the rack is a ladder: two uprights joined by 3 rungs. Lay two uprights on edge on a flat floor, wide faces toward each other, 17½″ apart, with your rung marks facing in.
- Lay each rung flat on the floor between them, its top edge on the mark. The floor side of the ladder becomes the outside end of the rack, with rungs and uprights flush.
- Glue the rung ends, clamp, drill two ⅛″ pilots through the upright into each rung end (2″ apart, ¾″ up from the floor so they hit the middle of the rung) and drive two 3″ screws.
- Build the second ladder as a mirror image, laid right on top of the first so the rungs line up.
- Screw a caster skid flat across the foot of each ladder. It is as wide as the uprights, so keep it flush with both faces, overhanging 1½″ front and back: three 3″ screws into the bottom rung (¾″ in from the outside face), one into the end of each upright.
Check: measure both diagonals of each ladder; they should match within ⅛″. - 4
Add the long rails and casters
Stand the ladders up 39½″ apart (rungs to the outside) and clamp the bottom front rail across the wide faces of the uprights, its top flush with the rung tops and its ends flush with the outside of the ladders; it sits on the ends of the skids.
- Spread glue on each lap, then two 2½″ screws on a diagonal into each upright. Rail plus upright is exactly 3″ thick, so a 3″ screw would poke through.
- Bottom back rail next, then the top pair flush with the tops of the uprights, checking the end uprights for plumb before you drive them. Fill in the middle rails last, each one level with its rungs.
- Lay the bare frame on its back. Drive two 3″ screws through each skid end up into the rail above it, heads countersunk flush so the caster plates sit flat.
- Lag a caster under each end of both skids, plate centered on the skid and ¼″ in from its end: ⅛″ pilots, four ¼″ × 1¼″ lags with washers each. Locking swivels on one ladder, rigid casters on the other, so it steers like a shopping cart.
The glued laps are what keep this rack from racking side to side, so don't skip the glue, and measure the diagonals across the front before it sets. - 5
Lay the slatted decks
2 decks: the gear shelf at the bottom and the floor of the ball bin. Work from the bottom up.
- At each end, a short slat (17½″) drops between the front and back uprights and rests on the rung, tight to the outside: two 1⅝″ screws into the rung.
- Then 9 full slats (23½″) across the front and back rails, about ¾″ apart. Lay them all out dry and even up the gaps before you screw: two 1⅝″ screws into each rail, ¾″ in from the slat ends, piloted so the ends don't split.
- 6
Slat the back and ends
Balls leave by the front only. Each bin gets 3 courses of 1×4 around the back and both ends, and the shelf gets one course 2″ above its deck so helmets and shoes don't get shoved out the back.
Course Bottom edge above the floor Shelf stop 11¾″ Bin course 1 29½″ Bin course 2 34½″ Bin course 3 39½″ - Back slats (46½″) go against the back faces of the back uprights, in line with the rails and ¾″ shy of their outside face: glue, then two 1⅝″ screws into each upright.
- End slats (23½″) run across the outside of each ladder, covering the ends of the back slats: two 1⅝″ screws, one above the other, into the edge of each upright. Pilot these: you are 2¼″ from the end of the slat and centered on a 1½″ edge.
- 7
String the bungee front
The front of the bin is 8 vertical runs of shock cord, 4⅜″ apart: tight enough to hold a pile of balls, loose enough to pull one out between two cords.
- Mark 8 points along the centerline of the front rail below the bin floor and the rail above it, every 4⅜″ starting 4⅜″ in from the upright. Pilot ⅛″ and turn in a screw eye at each mark (a screwdriver through the eye is your handle).
- Tie the cord to the first bottom eye with a double overhand knot. Lace up to the eye above, across to the next top eye, down, across the bottom, and so on.
- Go back along the lacing pulling out slack run by run until every vertical run is taut, then tie off at the last eye and melt the cut end with a lighter so it doesn't fray.
Wear safety glasses while you tension the cord, and never leave a stretched cord hooked on a single half-turned eye. - 8
Screw on the bat rail
The slotted 2×6 lies flat on top of one ladder, slots outboard: its inside edge flush with the inside face of the top rung, so it hangs 4″ past the frame.
- Glue, then five 2½″ screws straight down: three along the centerline of the top rung, and one into the top edge of the front rail and of the back rail, each ¾″ in from the inside edge of the 2×6.
- Bats hang by the knob, handle in the slot. Hockey and lacrosse sticks go in blade up; rackets hang by the throat.
- 9
Done
A 48″ rack with room for about 16 basketball-size balls, 5 bats or sticks, and a 14″-tall shelf for helmets, gloves and cleats. Ease the sharp edges with sandpaper wherever hands reach in.
Step on both caster locks whenever it's parked, and keep the heavy stuff (ball pump, cooler, catcher's gear) on the bottom shelf so it stays planted.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×6 × 8′
1 board24% yield2×4 × 8′
7 boards90% yield1×4 × 8′
10 boards91% yieldWidth is over the end slats; each bat rail hangs another 3¼″ past its end and sits 1½″ above the frame. Bungee spacing is set for size-3 soccer balls and up: baseballs and tennis balls go in a bucket on the shelf. It is a ball rack, not a climbing frame: lock the casters and keep kids off it.