Lumber Rack Builder
Shopping list
Uprights need the straightest studs in the pile; arms can be anything without a big knot near the wall end, which is where they're stressed.
| Item | Qty | Each | Total |
|---|---|---|---|
| 2×4×8′ SPF board | 14 | $3.50 | $49.00 |
| 2×4×10′ SPF board | 2 | $5.60 | $11.20 |
| ¾″ plywood, 4×8 sheet (bin) | 2 | $52.00 | $104.00 |
| ⅜″ × 6″ hex lag screw + washer | 20 | $1.45 | $29.00 |
| ⅜″ × 5″ carriage bolt, washer, nut | 16 | $1.60 | $25.60 |
| #9 × 2½″ construction screws, 1-lb box (about 180) | 3 | $10.00 | $30.00 |
| #8 × 1⅝″ wood screws, 1-lb box (about 120) | 1 | $9.00 | $9.00 |
| Total | $257.80 |
Tools: miter saw, drill with ⅜″ and ¼″ bits (the ⅜″ one at least 5″ long), impact driver or ratchet with a 9⁄16″ socket, stud finder, 4′ level, clamps, wood glue, sliding bevel or speed square set to 5°.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×4 × 8′
14 boards90% yield2×4 × 10′
2 boards99% yieldSheet goods
- K1 Bin back, bay 1: 1 × 34¼″ × 20″
- K2 Bin back, bay 2: 1 × 32″ × 20″
- K3 Bin back, bay 3: 1 × 34¼″ × 20″
- F1 Bin front, bay 1: 1 × 34¼″ × 20″
- F2 Bin front, bay 2: 1 × 32″ × 20″
- F3 Bin front, bay 3: 1 × 34¼″ × 20″
- M1 Bin bottom, bay 1: 1 × 32¾″ × 13½″
- M2 Bin bottom, bay 2: 1 × 30½″ × 13½″
- M3 Bin bottom, bay 3: 1 × 32¾″ × 13½″
- V Bin end (two per bin): 6 × 18½″ × 13½″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Each upright is two 2×4s on edge with spacer blocks between them; the arms slide into the slots, tilt up 5° so nothing rolls off, and get one bolt each. Lags go through the spacers into the stud behind. No studs, no rack: drywall anchors are not an option here.
- 1
Shopping list
Uprights need the straightest studs in the pile; arms can be anything without a big knot near the wall end, which is where they're stressed.
Item Qty Each Total 2×4×8′ SPF board 14 $3.50 $49.00 2×4×10′ SPF board 2 $5.60 $11.20 ¾″ plywood, 4×8 sheet (bin) 2 $52.00 $104.00 ⅜″ × 6″ hex lag screw + washer 20 $1.45 $29.00 ⅜″ × 5″ carriage bolt, washer, nut 16 $1.60 $25.60 #9 × 2½″ construction screws, 1-lb box (about 180) 3 $10.00 $30.00 #8 × 1⅝″ wood screws, 1-lb box (about 120) 1 $9.00 $9.00 Total $257.80 Tools: miter saw, drill with ⅜″ and ¼″ bits (the ⅜″ one at least 5″ long), impact driver or ratchet with a 9⁄16″ socket, stud finder, 4′ level, clamps, wood glue, sliding bevel or speed square set to 5°.
- 2
Cut list
Arms get a 5° cut on both ends, parallel: the back end sits plumb against the wall, the front end ends up plumb too. Spacers are square-cut; the slot is ⅜″ taller than the arm so the 5° tilt fits, and the bolt and screws lock it.
No 2×4 gets ripped: the spacers are the same 1½″ thickness as the arms, so every slot comes out exactly arm-thick.
Tag Part Length Qty Cut U Upright half (two per upright) 84″ 8 square A Arm 18⅛″ 16 5° both ends, parallel B Spacer, bottom (floor to first arm) 36″ 4 square S Spacer, between arms 8⅞″ 12 square T Spacer, top 5⅞″ 4 square L Bin sleeper (flat) 100½″ 2 square K1 Bin back, bay 1 (20″ wide) 34¼″ 1 square K2 Bin back, bay 2 (20″ wide) 32″ 1 square K3 Bin back, bay 3 (20″ wide) 34¼″ 1 square F1 Bin front, bay 1 (20″ wide) 34¼″ 1 square F2 Bin front, bay 2 (20″ wide) 32″ 1 square F3 Bin front, bay 3 (20″ wide) 34¼″ 1 square M1 Bin bottom, bay 1 (13½″ wide) 32¾″ 1 square M2 Bin bottom, bay 2 (13½″ wide) 30½″ 1 square M3 Bin bottom, bay 3 (13½″ wide) 32¾″ 1 square V Bin end (two per bin) (13½″ wide) 18½″ 6 square - 3
Assemble the uprights
Each upright is a sandwich: two 84″ halves on edge with spacer blocks between them. Lay one half flat, mark the bottom of every arm on it: 36″, 48¾″, 61½″, 74¼″.
- Glue and screw the bottom spacer flush with the bottom end, 2½″ screws every 8″ (a 3″ screw would come out the far side of the spacer and hold the second half off).
- Cut a gauge block 3⅞″ long from scrap: that is the slot height, ⅜″ more than the arm so the 5° tilt fits. Set it on the first mark, butt the next spacer against it, screw the spacer down. Pull the gauge and repeat up the upright; every spacer should start 3⅞″ above a mark.
- Lay the second half on top, flush all round, and screw it to every spacer the same way.
Every upright must match. Build the first, then use it as the pattern: clamp the next halves to it and transfer every mark. - 4
Lag them into the studs
Find and mark the studs; this plan puts an upright on every other one (4 uprights, 32″ on center). Stand each upright on the floor, plumb it both ways, and hold it with a temporary screw.
- Drill a ⅜″ clearance hole through each spacer, centered, then a ¼″ pilot into the stud behind.
- A ⅜″ × 6″ lag with washer through every spacer (5 per upright). Snug, not crushed.
Miss the stud and the lag is holding drywall. Probe with a finish nail where the washer will cover the hole until you hit wood. - 5
Install the arms
Slide each 18⅛″ arm into its slot, plumb end against the wall, tilted up so the outer end rises: a 5° arm climbs about 1⅝″ over its length.
- Drill ⅜″ straight through both halves and the arm, centered on the upright: 1¾″ from the wall and 1¾″ above the slot floor.
- Carriage bolt, washer, nut. Then two 2½″ screws through each half into the arm, near the top edge, offset so the two sides don't meet.
- Glue a thin wedge (a 5° offcut is perfect) into the gap above the arm at the wall end, so a loaded arm bears on the spacer above it and not on the bolt alone.
Check with a level across the arm tips of each row: all the same height, or long boards rock.
- 6
Build the offcut bins
3 separate plywood bins, one per stud bay, 15″ front to back and 20″ tall. They sit over two flat 2×4 sleepers that keep the bottoms off the concrete, and butt against each other on the centerline of each upright.
- Build each bin on the bench: stand its two ends (18½″ × 13½″) between the back and the front, top edges flush, so the back and front hang 1½″ below the ends. Glue, then 1⅝″ screws through the back and front into the end edges, four per joint, predrilled.
- Fit the bottom between the ends, flush with their lower edges; screw through the back, front and ends into its edges.
- Lay the two sleepers flat on the floor along the uprights: the back one ¾″ out from the upright faces (a plywood offcut is the spacer), the front one with its far edge 14¼″ out from them.
- Drop each bin over the sleepers (ends and bottom rest on them, the back and front reach the floor), push it against the uprights and drive 2½″ screws through the back into every upright face it touches, two per upright. A few 1⅝″ screws down through the bottom into each sleeper.
Short pieces stand on end; anything under 2′ that isn't worth a slot goes in the scrap bucket.
- 7
Done
4 levels on 4 uprights: room for 8′ and 10′ stock, sorted by size instead of leaning in a corner.
Each arm safely carries roughly 100 lb near the wall. Stack heavy hardwood close in, light trim near the tips, and never climb it.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×4 × 8′
14 boards90% yield2×4 × 10′
2 boards99% yieldSheet goods
- K1 Bin back, bay 1: 1 × 34¼″ × 20″
- K2 Bin back, bay 2: 1 × 32″ × 20″
- K3 Bin back, bay 3: 1 × 34¼″ × 20″
- F1 Bin front, bay 1: 1 × 34¼″ × 20″
- F2 Bin front, bay 2: 1 × 32″ × 20″
- F3 Bin front, bay 3: 1 × 34¼″ × 20″
- M1 Bin bottom, bay 1: 1 × 32¾″ × 13½″
- M2 Bin bottom, bay 2: 1 × 30½″ × 13½″
- M3 Bin bottom, bay 3: 1 × 32¾″ × 13½″
- V Bin end (two per bin): 6 × 18½″ × 13½″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Each upright is two 2×4s on edge with spacer blocks between them; the arms slide into the slots, tilt up 5° so nothing rolls off, and get one bolt each. Lags go through the spacers into the stud behind. No studs, no rack: drywall anchors are not an option here.