Firewood Rack Builder
Shopping list
Everything is pressure-treated, and the base and posts should be ground-contact rated (the tag says GC or UC4A) since they sit on pavers in the splash zone; buy all the 2×4s that way and they're interchangeable. Screws and connectors must be rated for treated lumber (coated or hot-dip galvanized): PT eats bright steel.
| Item | Qty | Each | Total |
|---|---|---|---|
| PT 2×4×8′, ground contact | 10 | $4.98 | $49.80 |
| Concrete patio block, 8″ × 16″ × 2″ | 6 | $2.10 | $12.60 |
| #9 × 3″ exterior deck screws (coated), 1-lb box (about 36) | 1 | $12.00 | $12.00 |
| #9 × 2½″ exterior deck screws (coated), 1-lb box (about 32) | 1 | $12.00 | $12.00 |
| Framing angle, galvanized (top rail to post) | 4 | $1.30 | $5.20 |
| 1½″ structural connector screws, 75-pack | 1 | $9.00 | $9.00 |
| Corrugated galvanized steel panel, 26″ × 8′ (5 pieces at 22⅝″) | 2 | $32.00 | $64.00 |
| #10 × 1½″ hex roofing screws with washers, 50-pack | 1 | $11.00 | $11.00 |
| End-cut wood preservative, 1 qt | 1 | $16.00 | $16.00 |
| Total | $191.60 |
Tools: circular saw or miter saw, drill/driver, 4′ level, tape, speed square, clamps, shovel and a bag of paver sand for leveling, tin snips or a metal-cutting blade for the steel.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×4 × 8′
10 boards89% yieldA face cord is a stack 8′ long and 4′ high, one split deep. A half cord is 8′ × 4′ × 2′. The whole frame is pressure-treated: it lives outside, and the base sits in the splash zone on pavers.
- 1
Shopping list
Everything is pressure-treated, and the base and posts should be ground-contact rated (the tag says GC or UC4A) since they sit on pavers in the splash zone; buy all the 2×4s that way and they're interchangeable. Screws and connectors must be rated for treated lumber (coated or hot-dip galvanized): PT eats bright steel.
Item Qty Each Total PT 2×4×8′, ground contact 10 $4.98 $49.80 Concrete patio block, 8″ × 16″ × 2″ 6 $2.10 $12.60 #9 × 3″ exterior deck screws (coated), 1-lb box (about 36) 1 $12.00 $12.00 #9 × 2½″ exterior deck screws (coated), 1-lb box (about 32) 1 $12.00 $12.00 Framing angle, galvanized (top rail to post) 4 $1.30 $5.20 1½″ structural connector screws, 75-pack 1 $9.00 $9.00 Corrugated galvanized steel panel, 26″ × 8′ (5 pieces at 22⅝″) 2 $32.00 $64.00 #10 × 1½″ hex roofing screws with washers, 50-pack 1 $11.00 $11.00 End-cut wood preservative, 1 qt 1 $16.00 $16.00 Total $191.60 Tools: circular saw or miter saw, drill/driver, 4′ level, tape, speed square, clamps, shovel and a bag of paver sand for leveling, tin snips or a metal-cutting blade for the steel.
- 2
Cut list
PT lumber is often wet from the yard; it shrinks a little as it dries, so build and screw it up the same day you cut it. Brush end-cut preservative on every cut end, especially the post bottoms.
Tag Part Length Qty Cut B Base rail, front/back 96″ 2 full 8′ board, factory ends X Base cross piece 13″ 5 square K Back corner post 55″ 2 square F Front corner post (taller, for roof pitch) 58″ 2 square T Top rail, front/back 96″ 2 full 8′ board, factory ends C End cleat 16″ 4 square D End brace (diagonal) 56½″ 2 cut long, mark in place, trim flush - 3
Pavers and base
Pick a spot with sun and wind on the long side, ideally not against the house (bugs). Set 6 patio blocks on scraped, sand-leveled ground: one under each corner and a pair under the middle.
Build the base ladder flat on the pavers: two 8′ base rails on edge, 5 cross pieces between them at ≤24″, one flush at each end, two 3″ exterior screws through the rail into each cross-piece end.
Check: level the base both ways with a 4′ level, shimming with paver sand, not wood. Square it by diagonals. - 4
Corner posts
Stand a post at each corner, wide face against the end cross piece, its edge flush with the outside of the base rail, bottom on the paver. Back posts 55″; front posts 58″ (taller, so the roof sheds to the back).
- Two 2½″ screws through each post into the face of the cross piece (3″ ones would come out the other side) and two 3″ screws into the base-rail end.
- Plumb each post with a level on two faces before the second pair of screws, then clamp a scrap across the tops to hold them.
- 5
Top rails
The top rails fit between the posts, like the base rails: 96″ long, outside faces flush with the post edges. The back rail's top is flush with the back post tops; the front rail's top sits 3½″ higher, about ½″ proud of the front post tops.
- Two 3″ screws through each post into the rail end.
- A framing angle in the inside corner of each joint (post face to rail face), with 1½″ connector screws.
These rails are what stop the ends bowing out when the stack leans. Don't skip the framing angles.
- 6
Brace the ends
On the outside of each end, screw a 16″ cleat across both posts at the bottom (level with the base) and another at the top, level with the back top rail. Two 2½″ screws per post.
Lay the diagonal across the outside of the cleats from the bottom back corner to the top front corner, mark both ends in place and cut. Two 2½″ screws into each cleat. On a narrow rack the brace is nearly vertical; it still stops the end racking front to back.
Rack the frame by hand before you brace it and after: the difference is the whole point of this step. - 7
Roof
The steel goes straight onto the top rails, sloping 14° from front to back, with corrugations running front to back so water runs off the back.
- Cut 5 pieces 22⅝″ long (3″ overhang front and back), and let the end pieces overhang the posts 3″.
- Overlap each piece one full rib over the last, laps facing away from the prevailing wind.
- Hex roofing screws through the crown of every other rib into the front and back top rails. Snug the washers; don't dimple the steel.
Steel edges are razors. Gloves on, and file the snipped edges. - 8
Stack it
Stack bark side up, tight to the posts at both ends, building the ends first so they lock each other. Stop at the top rails (4′ of wood); the middle settles.
Rows run the long way, one split deep, so air moves through. Leave 6″ between the rack and any wall.
- 9
Done
43 cubic feet of wood, 0.33 of a full cord, up off the dirt.
Green wood needs 6–12 months under cover to season. Two racks side by side, this year's and next year's, is the setup that never runs dry.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
2×4 × 8′
10 boards89% yieldA face cord is a stack 8′ long and 4′ high, one split deep. A half cord is 8′ × 4′ × 2′. The whole frame is pressure-treated: it lives outside, and the base sits in the splash zone on pavers.