Compost Bin Builder
Shopping list
Compost is wet, warm, and full of fungi: every board here is pressure-treated rated for ground contact. Untreated pine lasts about two seasons. Hot-dip galvanized or coated screws only.
| Item | Qty | Each | Total |
|---|---|---|---|
| 4×4×8′ pressure-treated, ground contact (posts) | 4 | $11.98 | $47.92 |
| 2×6×8′ pressure-treated (slats, front boards, stops) | 23 | $7.98 | $183.54 |
| 2×6×12′ pressure-treated (slats, front boards, stops) | 6 | $11.97 | $71.82 |
| 2×2×8 pressure-treated (or rip a 2×4) (channel cleats) | 2 | $3.48 | $6.96 |
| #9 × 3″ coated deck screws, 5-lb box (about 192) | 1 | $34.98 | $34.98 |
| ½″ × 36″ rebar stake (one beside each post) | 8 | $2.98 | $23.84 |
| ½″ galvanized two-hole strap (ties each stake to its post) | 8 | $0.68 | $5.44 |
| Total | $374.50 |
Tools: circular saw or miter saw, impact driver, drill with ⅛″ pilot bit, 4′ level, speed square, tape, sledge for the stakes, 3″ hole saw or ½″ bit (optional, for extra air holes).
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
4×4 × 8′
4 boards75% yield2×6 × 8′
23 boards81% yield2×6 × 12′
6 boards87% yield2×2 × 8′
2 boards75% yieldSide and back slats leave an air gap; the front boards stack tight and slide out of a channel at each post. Prices are per 8′ board; longer boards are priced pro rata.
- 1
Shopping list
Compost is wet, warm, and full of fungi: every board here is pressure-treated rated for ground contact. Untreated pine lasts about two seasons. Hot-dip galvanized or coated screws only.
Item Qty Each Total 4×4×8′ pressure-treated, ground contact (posts) 4 $11.98 $47.92 2×6×8′ pressure-treated (slats, front boards, stops) 23 $7.98 $183.54 2×6×12′ pressure-treated (slats, front boards, stops) 6 $11.97 $71.82 2×2×8 pressure-treated (or rip a 2×4) (channel cleats) 2 $3.48 $6.96 #9 × 3″ coated deck screws, 5-lb box (about 192) 1 $34.98 $34.98 ½″ × 36″ rebar stake (one beside each post) 8 $2.98 $23.84 ½″ galvanized two-hole strap (ties each stake to its post) 8 $0.68 $5.44 Total $374.50 Tools: circular saw or miter saw, impact driver, drill with ⅛″ pilot bit, 4′ level, speed square, tape, sledge for the stakes, 3″ hole saw or ½″ bit (optional, for extra air holes).
- 2
Cut list
Back slats run the full width, past both end walls. Front boards are ¼″ shorter than the 36″ opening so they drop in and lift out easily, even swollen.
Tag Part Length Qty Cut P Post, 4×4 36″ 8 square B Back slat, 2×6 125″ 6 square E End slat, 2×6 43″ 12 square V Divider slat, 2×6 41″ 12 square F Front board (removable), 2×6 35¾″ 18 ease all edges S Front stop, 2×6 on the flat 36″ 4 square C Channel cleat, 2×2 36″ 4 square The back slats are 125″: buy 12′ boards for those, or split them over a middle post and add a 2×4 splice block behind the joint. - 3
Set the posts
Pick a level spot on bare soil, part shade, near a hose. Mark out 8 post positions: 4 along the back and 4 along the front, 36″ clear between neighbors, 43″ front to back, outside to outside. The posts stand on the ground; nothing is buried.
- Check the rectangle by its diagonals.
- Level the spots against each other with a long straight board; dig out high spots rather than shimming.
- Loose posts won't stand by themselves. The next step joins the back row into one wall lying flat, then you tip it up.
Worms come up from the ground, so no floor. Hardware cloth under the bays keeps rodents out if that's a problem where you live. - 4
Back wall
6 back slats across the back face of the posts, ½″ apart, bottom one ½″ off the ground. They overhang both end posts by 1½″ to cover the end slats.
- Easiest flat: lay the 4 back posts on the ground, back face up, 36″ apart and bottoms in line, and screw the slats on. Check the diagonals, then tip the wall up onto its marks and prop it with a scrap.
- Two 3″ screws into every post, every slat.
- Use a scrap of the right thickness as a spacer, and keep the bottom slat square to the posts. The rest follow it.
Once the walls are up, drive a rebar stake about 24″ into the ground tight against the inside face of each post and screw a two-hole strap over it into the post. A full bin leans on its walls; the stakes keep the posts from walking. - 5
End walls and dividers
Stand the front posts on their marks and tie each one to its back post: end slats on the outside face of each end post pair, butted against the back slats and running to the front face of the front post. Divider slats on the right face of each middle post pair, flush with the back of the back post and stopping 2″ short of the front so the front boards can pass.
- Same gap, same heights as the back, so the rows line up all the way around. Plumb each front post before you drive the second screw.
- Pre-drill slat ends; treated lumber splits when it's wet.
- 6
Front channels
Each front board slides down a channel: a 2×2 cleat behind it and a 2×6 stop in front.
- 4 2×2 cleats, flush with the back of the front posts: one on the right face of the left end post, one on the left face of every other front post. In bays 2 and up, the divider slat ends act as the left-hand cleat.
- 2×6 stops on the flat across the front face of each front post, overlapping into the opening by 1–2″. Screw them to the post every 8″.
- Test with a scrap 2×6 before the last screw: it should drop in freely with about ½″ of play.
- 7
Front boards
6 boards per bay, stacked tight, dropped into the channels. The stack is 33″ tall, 3″ below the post tops. Round the top edges with a sander so they're easy on the hands.
Pull the top two or three to load a bay; pull them all to fork a finished bay into the next.
- 8
Done
3 bays, about 31 ft³ each. Left bay fresh, middle cooking, right finished; turn left to right every couple of weeks.
Equal parts browns (leaves, cardboard) and greens (scraps, grass) by volume. Damp like a wrung-out sponge. A pile this size should hit 130–150°F in a week.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
4×4 × 8′
4 boards75% yield2×6 × 8′
23 boards81% yield2×6 × 12′
6 boards87% yield2×2 × 8′
2 boards75% yieldSide and back slats leave an air gap; the front boards stack tight and slide out of a channel at each post. Prices are per 8′ board; longer boards are priced pro rata.